Natural gas power plant, Florida
Eight Flags Energy natural gas power plant, Florida
Eight Flags Energy is a 21.6 MW natural gas power plant in Nassau County, Florida, operated by Eight Flags Energy LLC, and it generated 147,163 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 92nd percentile of U.S. natural gas plants. By 2025 generation it ranks 2,932nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Eight Flags Energy plant run compared with other natural gas plants?
The Eight Flags Energy plant had a capacity factor of 79% in 2025 on 21.4 MW of net summer capacity, the 92nd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 287 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Eight Flags Energy | 79% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Eight Flags Energy plant generating more or less than last year?
Generation at Eight Flags Energy fell 9.4% from 2024 to 2025, from 162,430 MWh to 147,163 MWh.
| Period | MWh |
|---|---|
| 2024 | 162,430 |
| 2025 | 147,163 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 10,309 |
| November 2025 | 9,580 |
| October 2025 | 12,735 |
| September 2025 | 13,858 |
| August 2025 | 15,559 |
| July 2025 | 15,761 |
| June 2025 | 14,360 |
| May 2025 | 13,781 |
| April 2025 | 10,631 |
| March 2025 | 10,017 |
| February 2025 | 9,554 |
| January 2025 | 11,018 |
| December 2024 | 10,757 |
| November 2024 | 12,135 |
| October 2024 | 13,938 |
| September 2024 | 16,328 |
| August 2024 | 16,780 |
| July 2024 | 17,007 |
| June 2024 | 15,317 |
| May 2024 | 15,178 |
| April 2024 | 11,184 |
| March 2024 | 11,896 |
| February 2024 | 10,104 |
| January 2024 | 11,805 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Eight Flags Energy plant, and when do they retire?
1 operable generator totals 21.6 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 22 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 01 | Operating | Natural Gas Fired Combustion Turbine | 22 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Eight Flags Energy plant?
EIA lists no joint owners for Eight Flags Energy. Eight Flags Energy LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Eight Flags Energy plant?
Eight Flags Energy is in Fernandina Beach, Nassau County, Florida, at 30.6608° N, 81.4706° W. It sits in the JEA balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Florida are similar in size?
Florida has 68 operable natural gas plants with 52,894 MW of capacity, and Eight Flags Energy's 21.6 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| G W Ivey | Miami Dade | 34 | -4,084 |
| Seminole Mill | Duval | 30 | 150,119 |
| Eight Flags Energy | Nassau | 22 | 147,163 |
| Sub 12 | Leon | 19 | 18,345 |
| Pea Ridge | Santa Rosa | 14 | 85,808 |
| Standby Generation Plant | Escambia | 14 | 5 |
Source: EIA Forms EIA-860 and EIA-923, 2025.