Skip to main content
RateWatt

Natural gas power plant, Kansas

El Dorado Refinery natural gas power plant, Kansas

El Dorado Refinery is a 38.9 MW natural gas power plant in Butler County, Kansas, operated by Frontier El Dorado Refinery LLC, and it generated 220,410 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Kansas, and its capacity factor sits at the 92nd percentile of U.S. natural gas plants. By 2025 generation it ranks 2,363rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

38.9 MWNameplate capacity
79%Capacity factor, 2025, 92nd percentile, on 32 MW net summer
0.4%Of KS generation, 2025
29 yearsAverage generator age, by MW

How hard does the El Dorado Refinery plant run compared with other natural gas plants?

The El Dorado Refinery plant had a capacity factor of 79% in 2025 on 32 MW of net summer capacity, the 92nd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 287 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
El Dorado Refinery79%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the El Dorado Refinery plant generating more or less than last year?

Generation at El Dorado Refinery fell 1.4% from 2024 to 2025, from 223,568 MWh to 220,410 MWh. Through August 2026 it is running 4.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024223,568
2025220,410
2026 through August146,395
2025, same months140,650
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202617,737
July 202615,907
June 202617,524
May 202613,712
April 202620,207
March 202621,114
February 202616,897
January 202623,297
December 202523,250
November 202520,198
October 202518,642
September 202517,671
August 202518,345
July 202519,252
June 202518,967
May 202519,407
April 20254,042
March 202520,952
February 202516,897
January 202522,788
December 202423,212
November 202420,561
October 202420,403
September 2024698
August 202419,817
July 202410,539
June 202419,249
May 202422,158
April 202420,448
March 202421,796
February 202420,065
January 202424,623

Source: EIA Form EIA-923, through August 2026.

How much of Kansas' electricity comes from the El Dorado Refinery plant?

El Dorado Refinery made 0.4% of the 61,984,540 MWh reported by Kansas plants in 2025, from 0.2% of the state's 20,969 MW of capacity. Its share of output is 1.9 times its share of capacity. By capacity it is the 77th largest of 190 plants in Kansas, the 4,145th largest of 14,327 in the U.S. and the 1,167th largest of 1,962 natural gas plants. By 2025 generation it is the 52nd largest of 173 generating plants in the state.

El Dorado Refinery within Kansas, 2025
MeasureThis plantKansasShare
Capacity (MW)3920,9690.2%
Generation (MWh)220,41061,984,5400.4%
Natural gas capacity (MW)393,8801.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the El Dorado Refinery plant, and when do they retire?

1 operable generator totals 38.9 MW, with an average age of 29 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s139100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
L3804On standbyNatural Gas Fired Combustion Turbine391996n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the El Dorado Refinery plant?

EIA lists no joint owners for El Dorado Refinery. Frontier El Dorado Refinery LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the El Dorado Refinery plant?

El Dorado Refinery is in El Dorado, Butler County, Kansas, at 37.7928° N, 96.8772° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Kansas are similar in size?

Kansas has 54 operable natural gas plants with 3,880 MW of capacity, and El Dorado Refinery's 38.9 MW is 1% of that.

Natural gas plants in Kansas around this size
PlantCountyMW2025 MWh
CML&P Generating Facility No. 2Montgomery5684,697
CoffeyvilleMontgomery4015,276
Gardner Energy CenterJohnson39504
El Dorado RefineryButler39220,410
Jameson Energy CenterFinney28175
East 12th StreetCowley2710,514
Chanute 3Neosho23260

Source: EIA Forms EIA-860 and EIA-923, 2025.