Solar power plant, Virginia
Essex Solar Center, Virginia
Essex Solar Center is a 20 MW solar power plant in Essex County, Virginia, operated by Arevon Energy, Inc., and it generated 38,686 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 41st percentile of U.S. solar plants. By 2025 generation it ranks 4,407th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Essex Solar Center plant run compared with other solar plants?
The Essex Solar Center plant had a capacity factor of 22% in 2025 on 20 MW of net summer capacity, the 41st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 81 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Essex Solar Center | 22% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Essex Solar Center plant generating more or less than last year?
Generation at Essex Solar Center rose 8.6% from 2024 to 2025, from 35,615 MWh to 38,686 MWh. Through August 2026 it is running 6.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 35,615 |
| 2025 | 38,686 |
| 2026 through August | 30,997 |
| 2025, same months | 29,191 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 4,086 |
| July 2026 | 4,254 |
| June 2026 | 5,198 |
| May 2026 | 4,768 |
| April 2026 | 4,268 |
| March 2026 | 3,745 |
| February 2026 | 2,472 |
| January 2026 | 2,206 |
| December 2025 | 1,753 |
| November 2025 | 2,222 |
| October 2025 | 2,744 |
| September 2025 | 2,776 |
| August 2025 | 4,270 |
| July 2025 | 1,894 |
| June 2025 | 6,558 |
| May 2025 | 4,099 |
| April 2025 | 4,308 |
| March 2025 | 4,001 |
| February 2025 | 2,281 |
| January 2025 | 1,780 |
| December 2024 | 1,538 |
| November 2024 | 2,042 |
| October 2024 | 3,445 |
| September 2024 | 2,812 |
| August 2024 | 3,179 |
| July 2024 | 3,602 |
| June 2024 | 5,001 |
| May 2024 | 3,314 |
| April 2024 | 3,789 |
| March 2024 | 3,068 |
| February 2024 | 2,370 |
| January 2024 | 1,455 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Essex Solar Center plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ESSEX | Operating | Solar Photovoltaic | 20 | 2017 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Essex Solar Center plant?
EIA lists no joint owners for Essex Solar Center. Arevon Energy, Inc. operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Essex Solar Center plant?
Essex Solar Center is in Dunnsville, Essex County, Virginia, at 37.8341° N, 76.8000° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Virginia are similar in size?
Virginia has 141 operable solar plants with 5,163 MW of capacity, and Essex Solar Center's 20 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Sussex Drive, LLC | Sussex | 20 | 39,249 |
| Scott-II Solar LLC | Powhatan | 20 | 38,913 |
| Hecate Energy Cherrydale LLC | Northampton | 20 | 33,195 |
| Essex Solar Center | Essex | 20 | 38,686 |
| Richmond Spider Solar | Spotsylvania | 20 | 36,232 |
| Energix Nokesville, LLC | Prince William | 20 | 38,933 |
| Energix Buckingham, LLC | Buckingham | 20 | 40,515 |
Source: EIA Forms EIA-860 and EIA-923, 2025.