Skip to main content
RateWatt

Hydro power plant, California

Exchequer hydroelectric power plant, California

Exchequer is a 94.5 MW hydro power plant in Mariposa County, California, operated by Merced Irrigation District, and it generated 245,804 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 42nd percentile of U.S. hydro plants. By 2025 generation it ranks 2,250th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

94.5 MWNameplate capacity
30%Capacity factor, 2025, 42nd percentile, on 94.5 MW net summer
0.1%Of CA generation, 2025
58 yearsAverage generator age, by MW

How hard does the Exchequer plant run compared with other hydro plants?

The Exchequer plant had a capacity factor of 30% in 2025 on 94.5 MW of net summer capacity, the 42nd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 108 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Exchequer30%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Exchequer plant generating more or less than last year?

Generation at Exchequer fell 8.2% from 2024 to 2025, from 267,905 MWh to 245,804 MWh.

Net generation by period
PeriodMWh
2024267,905
2025245,804
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,086
November 202515
October 202513,317
September 202524,542
August 202532,146
July 202545,131
June 202539,178
May 202531,065
April 202520,826
March 202528,284
February 20255,022
January 20254,192
December 20243,241
November 20241,366
October 202418,490
September 202423,381
August 202438,912
July 202447,054
June 202438,859
May 202431,775
April 202411,155
March 202416,428
February 202428,622
January 20248,622

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Exchequer plant?

Exchequer made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 297th largest of 1,877 plants in California, the 2,808th largest of 14,327 in the U.S. and the 169th largest of 1,393 hydro plants. By 2025 generation it is the 223rd largest of 1,608 generating plants in the state.

Exchequer within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)95107,4330.1%
Generation (MWh)245,804204,542,8980.1%
Hydro capacity (MW)959,9361.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Exchequer plant, and when do they retire?

1 operable generator totals 94.5 MW, with an average age of 58 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s195100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric951967n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Exchequer plant?

EIA lists no joint owners for Exchequer. Merced Irrigation District operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Merced Irrigation District charge homes?

Merced Irrigation District, the operator of Exchequer, had an average residential price of 24.15¢ per kWh and an average bill of $144 a month in 2025, 23% below the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
Merced Irrigation District24.15¢$14423% lower
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Exchequer plant?

Exchequer is in Snelling, Mariposa County, California, at 37.5843° N, 120.2686° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in California are similar in size?

California has 238 operable hydro plants with 9,936 MW of capacity, and Exchequer's 94.5 MW is 1% of that.

Hydro plants in California around this size
PlantCountyMW2025 MWh
ElectraAmador103291,434
Big Creek 4Madera100365,498
Balch 2Fresno97342,259
ExchequerMariposa95245,804
Big Creek 1Fresno88409,073
StanislausTuolumne82199,829
Pit 3Shasta80374,621

Source: EIA Forms EIA-860 and EIA-923, 2025.