Fenton Wind Farm, Minnesota

Fenton Wind Farm is a 206 MW wind power plant in Murray County, Minnesota, operated by EDF Renewable Asset Holdings, Inc., and it generated 387,878 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Minnesota, and its capacity factor sits at the 13th percentile of U.S. wind plants. By 2025 generation it ranks 1,624th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

206 MWNameplate capacity
22%Capacity factor, 2025, 13th percentile, on 206 MW net summer
0.7%Of MN generation, 2025
18 yearsAverage generator age, by MW

How hard does the Fenton Wind Farm plant run compared with other wind plants?

The Fenton Wind Farm plant had a capacity factor of 22% in 2025 on 206 MW of net summer capacity, the 13th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 79 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Fenton Wind Farm22%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Fenton Wind Farm plant generating more or less than last year?

Generation at Fenton Wind Farm rose 42.6% from 2024 to 2025, from 271,975 MWh to 387,878 MWh. Through August 2026 it is running 2.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024271,975
2025387,878
2026 through August234,500
2025, same months240,429
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202624,739
July 202623,503
June 202623,630
May 202629,057
April 202630,192
March 202637,501
February 202636,351
January 202629,527
December 202553,443
November 202536,440
October 202536,614
September 202520,952
August 202523,041
July 202528,475
June 202524,937
May 202526,365
April 202529,032
March 202537,093
February 202537,261
January 202534,225
December 202428,978
November 202423,121
October 202426,690
September 202423,480
August 202422,409
July 202416,633
June 202420,860
May 202417,031
April 202421,596
March 202431,083
February 202411,965
January 202428,129

Source: EIA Form EIA-923, through August 2026.

How much of Minnesota's electricity comes from the Fenton Wind Farm plant?

Fenton Wind Farm made 0.7% of the 58,638,010 MWh reported by Minnesota plants in 2025, from 1.0% of the state's 19,860 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 21st largest of 804 plants in Minnesota, the 1,459th largest of 14,327 in the U.S. and the 224th largest of 1,358 wind plants. By 2025 generation it is the 27th largest of 760 generating plants in the state.

Fenton Wind Farm within Minnesota, 2025
MeasureThis plantMinnesotaShare
Capacity (MW)20619,8601.0%
Generation (MWh)387,87858,638,0100.7%
Wind capacity (MW)2064,9564.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Fenton Wind Farm plant, and when do they retire?

1 operable generator totals 206 MW, with an average age of 18 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s1206100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine2062007n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Fenton Wind Farm plant?

EIA lists no joint owners for Fenton Wind Farm. EDF Renewable Asset Holdings, Inc. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Fenton Wind Farm plant?

Fenton Wind Farm is in Chandler, Murray County, Minnesota, at 43.8528° N, 96.0183° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Minnesota are similar in size?

Minnesota has 121 operable wind plants with 4,956 MW of capacity, and Fenton Wind Farm's 206 MW is 4% of that.

Wind plants in Minnesota around this size
PlantCountyMW2025 MWh
Nobles 2 Wind ProjectNobles250973,703
Freeborn Wind FarmFreeborn218785,185
Fenton Wind FarmMurray206387,878
Lakefield Wind Project LLCJackson206373,701
Bent Tree Wind Farm Phase 1Freeborn201334,066
Nobles Wind ProjectNobles201823,297