Fermi is a 1,281 MW power plant, 1,217 MW of it nuclear, in Monroe County, Michigan, operated by DTE Electric Company, and it generated 9,947,689 MWh in 2025 (Forms EIA-860 and EIA-923). That is 7.8% of the generation reported in Michigan, and its capacity factor sits at the 91st percentile of U.S. nuclear plants. By 2025 generation it ranks 65th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Fermi plant run compared with other nuclear plants?
The Fermi plant's nuclear units had a capacity factor of 100% in 2025 on 1,141 MW of net summer capacity, the 91st percentile of the 54 U.S. nuclear plants with at least 20 MW. The typical nuclear plant reached 95%. That equals about 363 days at full output out of 365.
0%Shaded: the middle half of nuclear plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Fermi | 100% |
| Nuclear plants, 75th percentile | 97% |
| Nuclear plants, median | 95% |
| Nuclear plants, 25th percentile | 90% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its nuclear generators only. Values above 105% are left out of the comparison.
Is the Fermi plant generating more or less than last year?
Fermi generated 9,947,689 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 35.3% behind the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.
2 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.
| Period | MWh |
|---|---|
| 2024 | 8,255,762 |
| 2025 | 9,947,689 |
| 2026 through August | 4,279,614 |
| 2025, same months | 6,614,806 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 855,710 |
| July 2026 | 520,286 |
| June 2026 | 640,526 |
| May 2026 | 211,587 |
| April 2026 | -4,256 |
| March 2026 | 530,881 |
| February 2026 | 717,040 |
| January 2026 | 807,840 |
| December 2025 | 856,572 |
| November 2025 | 824,745 |
| October 2025 | 841,467 |
| September 2025 | 810,099 |
| August 2025 | 824,721 |
| July 2025 | 828,331 |
| June 2025 | 803,527 |
| May 2025 | 848,532 |
| April 2025 | 823,474 |
| March 2025 | 854,922 |
| February 2025 | 770,645 |
| January 2025 | 860,654 |
| December 2024 | 860,956 |
| November 2024 | 831,275 |
| October 2024 | 845,603 |
| September 2024 | 813,536 |
| August 2024 | 837,364 |
| July 2024 | 837,488 |
| June 2024 | 811,151 |
| May 2024 | 498,974 |
| April 2024 | -4,032 |
| March 2024 | 594,234 |
| February 2024 | 694,326 |
| January 2024 | 634,887 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Fermi plant, and when do they retire?
5 operable generators total 1,281 MW, with an average age of 38 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1960s | 4 | 64 | 5% | none reported |
| 1980s | 1 | 1,217 | 95% | none reported |
Every generator, 5 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 3 | Operating | Petroleum Liquids | 16 | 1966 | n/a |
| 4 | Operating | Petroleum Liquids | 16 | 1966 | n/a |
| GT1 | Operating | Petroleum Liquids | 16 | 1966 | n/a |
| GT2 | Operating | Petroleum Liquids | 16 | 1966 | n/a |
| 2 | Operating | Nuclear | 1,217 | 1988 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Fermi plant?
EIA lists no joint owners for Fermi. DTE Electric Company operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does DTE Electric Company charge homes?
DTE Electric Company, the operator of Fermi, had an average residential price of 20.25¢ per kWh and an average bill of $126 a month in 2025, 1% above the Michigan average of 20.03¢.
| Measure | Price | Monthly bill | Against Michigan |
|---|---|---|---|
| DTE Electric Company | 20.25¢ | $126 | 1% higher |
| Michigan average | 20.03¢ | $127 | |
| U.S. average | 17.23¢ | $151 | 14% lower |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
What fuels does the Fermi plant use?
Fermi has capacity on 2 fuels: 95% nuclear and 5% petroleum. In 2025, nuclear made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Nuclear | 1,217 | 95.0% | 9,947,954 |
| Petroleum | 64 | 5.0% | -265 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Fermi plant?
Fermi is in Frenchtown Twp, Monroe County, Michigan, at 41.9631° N, 83.2581° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which nuclear plants in Michigan are similar in size?
Michigan has 3 operable nuclear plants with 4,314 MW of capacity, and Fermi's 1,217 MW is 28% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Donald C Cook | Berrien | 2,285 | 17,586,009 |
| Fermi | Monroe | 1,217 | 9,947,954 |
| Palisades | Van Buren | 812 | n/a |