Hydro power plant, Utah

Flaming Gorge hydroelectric power plant, Utah

Flaming Gorge is a 152 MW hydro power plant in Daggett County, Utah, operated by U S Bureau of Reclamation, and it generated 323,236 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.8% of the generation reported in Utah, and its capacity factor sits at the 29th percentile of U.S. hydro plants. By 2025 generation it ranks 1,867th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

152 MWNameplate capacity
24%Capacity factor, 2025, 29th percentile, on 152 MW net summer
0.8%Of UT generation, 2025
62 yearsAverage generator age, by MW

How hard does the Flaming Gorge plant run compared with other hydro plants?

The Flaming Gorge plant had a capacity factor of 24% in 2025 on 152 MW of net summer capacity, the 29th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 89 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Flaming Gorge24%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Flaming Gorge plant generating more or less than last year?

Generation at Flaming Gorge fell 20.8% from 2024 to 2025, from 407,932 MWh to 323,236 MWh.

Net generation by period
PeriodMWh
2024407,932
2025323,236
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202518,310
November 202517,847
October 202518,503
September 202536,194
August 202538,919
July 202536,281
June 202533,299
May 202528,353
April 202525,578
March 202524,675
February 202517,141
January 202528,136
December 202428,223
November 202420,371
October 202423,770
September 202436,066
August 202437,024
July 202427,701
June 202431,144
May 202447,413
April 202438,152
March 202424,956
February 202444,117
January 202448,995

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from the Flaming Gorge plant?

Flaming Gorge made 0.8% of the 38,124,679 MWh reported by Utah plants in 2025, from 1.4% of the state's 11,140 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 14th largest of 126 plants in Utah, the 1,951st largest of 14,327 in the U.S. and the 102nd largest of 1,393 hydro plants. By 2025 generation it is the 12th largest of 117 generating plants in the state.

Flaming Gorge within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)15211,1401.4%
Generation (MWh)323,23638,124,6790.8%
Hydro capacity (MW)15226457.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Flaming Gorge plant, and when do they retire?

3 operable generators total 152 MW, with an average age of 62 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s3152100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric511963n/a
2OperatingConventional Hydroelectric511963n/a
3OperatingConventional Hydroelectric511964n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Flaming Gorge plant?

EIA lists no joint owners for Flaming Gorge. U S Bureau of Reclamation operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Flaming Gorge plant?

Flaming Gorge is in Dutch John, Daggett County, Utah, at 40.9146° N, 109.4217° W. It sits in the Western Area Power Administration UGP West balancing area (NERC region WECC).