Flat Fork Solar is a 200 MW solar power plant in St Francis County, Arkansas, operated by Flat Fork Solar, LLC, and it generated 194,507 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Arkansas, and its capacity factor sits at the 8th percentile of U.S. solar plants. By 2025 generation it ranks 2,536th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Flat Fork Solar plant run compared with other solar plants?
The Flat Fork Solar plant had a capacity factor of 11% in 2025 on 200 MW of net summer capacity, the 8th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 41 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Flat Fork Solar | 11% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Flat Fork Solar plant generating more or less than last year?
Flat Fork Solar generated 194,507 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 245.5% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 194,507 |
| 2026 through August | 351,993 |
| 2025, same months | 101,893 |
Monthly generation, Jun 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 54,579 |
| July 2026 | 54,091 |
| June 2026 | 51,260 |
| May 2026 | 47,805 |
| April 2026 | 42,668 |
| March 2026 | 40,635 |
| February 2026 | 32,764 |
| January 2026 | 28,191 |
| December 2025 | 18,897 |
| November 2025 | 26,300 |
| October 2025 | 3,746 |
| September 2025 | 43,671 |
| August 2025 | 54,271 |
| July 2025 | 43,876 |
| June 2025 | 3,746 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Flat Fork Solar plant, and when do they retire?
1 operable generator totals 200 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 200 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| FFOR1 | Operating | Solar Photovoltaic | 200 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Flat Fork Solar plant?
EIA lists no joint owners for Flat Fork Solar. Flat Fork Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Flat Fork Solar plant?
Flat Fork Solar is in Wheatley, St Francis County, Arkansas, at 34.8828° N, 91.1041° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Arkansas are similar in size?
Arkansas has 65 operable solar plants with 2,534 MW of capacity, and Flat Fork Solar's 200 MW is 8% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Long Lake Solar, LLC | Phillips | 200 | 371,365 |
| Forgeview Solar | Mississippi | 200 | 53,234 |
| Flat Fork Solar | St Francis | 200 | 194,507 |
| West Memphis Solar Station | Crittenden | 180 | 347,258 |
| Big Cypress Solar, LLC | Crittenden | 180 | 426,346 |
| Newport Solar Project | Jackson | 180 | 356,412 |
Source: EIA Forms EIA-860 and EIA-923, 2025.