Natural gas power plant, Colorado

Fountain Valley Power Facility, Colorado

Fountain Valley Power Facility is a 228 MW natural gas power plant in El Paso County, Colorado, operated by Fountain Valley Power LLC, and it generated 237,664 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Colorado, and its capacity factor sits at the 38th percentile of U.S. natural gas plants. By 2025 generation it ranks 2,283rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

228 MWNameplate capacity
12%Capacity factor, 2025, 38th percentile, on 234 MW net summer
0.4%Of CO generation, 2025
24 yearsAverage generator age, by MW

How hard does the Fountain Valley Power Facility plant run compared with other natural gas plants?

The Fountain Valley Power Facility plant had a capacity factor of 12% in 2025 on 234 MW of net summer capacity, the 38th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 42 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Fountain Valley Power Facility12%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Fountain Valley Power Facility plant generating more or less than last year?

Generation at Fountain Valley Power Facility rose 184.8% from 2024 to 2025, from 83,442 MWh to 237,664 MWh. Through August 2026 it is running 68.7% behind the same months of 2025.

Net generation by period
PeriodMWh
202483,442
2025237,664
2026 through August65,586
2025, same months209,716
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20268,152
July 202613,730
June 20263,424
May 202610,249
April 20266,547
March 202611,075
February 20261,539
January 202610,870
December 20256,148
November 20251,748
October 20256,257
September 202513,795
August 202543,100
July 202539,862
June 202537,047
May 202511,659
April 202528,339
March 202527,903
February 20258,417
January 202513,389
December 20246,689
November 20244,552
October 20244,238
September 20247,758
August 202410,492
July 202410,734
June 20249,116
May 20245,240
April 202411,841
March 20245,413
February 20243,431
January 20243,938

Source: EIA Form EIA-923, through August 2026.

How much of Colorado's electricity comes from the Fountain Valley Power Facility plant?

Fountain Valley Power Facility made 0.4% of the 55,830,894 MWh reported by Colorado plants in 2025, from 1.0% of the state's 22,712 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 30th largest of 321 plants in Colorado, the 1,370th largest of 14,327 in the U.S. and the 685th largest of 1,962 natural gas plants. By 2025 generation it is the 46th largest of 292 generating plants in the state.

Fountain Valley Power Facility within Colorado, 2025
MeasureThis plantColoradoShare
Capacity (MW)22822,7121.0%
Generation (MWh)237,66455,830,8940.4%
Natural gas capacity (MW)2287,9622.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Fountain Valley Power Facility plant, and when do they retire?

6 operable generators total 228 MW, with an average age of 24 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s6228100%none reported
Every generator, 6 in all
UnitStatusTechnologyMWIn servicePlanned retirement
S1OperatingNatural Gas Fired Combustion Turbine382001n/a
S2OperatingNatural Gas Fired Combustion Turbine382001n/a
S3OperatingNatural Gas Fired Combustion Turbine382001n/a
S4OperatingNatural Gas Fired Combustion Turbine382001n/a
S5OperatingNatural Gas Fired Combustion Turbine382001n/a
S6OperatingNatural Gas Fired Combustion Turbine382001n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Fountain Valley Power Facility plant?

EIA lists no joint owners for Fountain Valley Power Facility. Fountain Valley Power LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Fountain Valley Power Facility plant?

Fountain Valley Power Facility is in Fountain, El Paso County, Colorado, at 38.5569° N, 104.6875° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Colorado are similar in size?

Colorado has 29 operable natural gas plants with 7,962 MW of capacity, and Fountain Valley Power Facility's 228 MW is 3% of that.

Natural gas plants in Colorado around this size
PlantCountyMW2025 MWh
Manchief Electric Generating StationMorgan300283,691
Brush Generation FacilityMorgan273126,277
South Plant (CO)El Paso24573,165
Fountain Valley Power FacilityEl Paso228237,664
Arapahoe Combustion Turbine ProjectDenver194310,442
Mountain Peak Power StationWeld163124,387
Limon Generating StationLincoln154146,635

Source: EIA Forms EIA-860 and EIA-923, 2025.