Wind power plant, Oklahoma

Frontier Windpower II wind power plant, Oklahoma

Frontier Windpower II is a 352 MW wind power plant in Kay County, Oklahoma, operated by Deriva Energy, and it generated 545,155 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Oklahoma, and its capacity factor sits at the 7th percentile of U.S. wind plants. By 2025 generation it ranks 1,255th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

352 MWNameplate capacity
18%Capacity factor, 2025, 7th percentile, on 352 MW net summer
0.6%Of OK generation, 2025
4 yearsAverage generator age, by MW

How hard does the Frontier Windpower II plant run compared with other wind plants?

The Frontier Windpower II plant had a capacity factor of 18% in 2025 on 352 MW of net summer capacity, the 7th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 65 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Frontier Windpower II18%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Frontier Windpower II plant generating more or less than last year?

Generation at Frontier Windpower II fell 10.4% from 2024 to 2025, from 608,188 MWh to 545,155 MWh. Through August 2026 it is running 71.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024608,188
2025545,155
2026 through August637,444
2025, same months371,966
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202698,347
July 202646,712
June 202677,898
May 202682,040
April 2026105,440
March 202673,821
February 202641,054
January 2026112,132
December 202564,451
November 202537,802
October 202532,400
September 202538,536
August 202552,684
July 202574,311
June 202548,314
May 202537,143
April 202528,276
March 202532,313
February 202547,519
January 202551,406
December 202462,763
November 202437,743
October 202445,507
September 202448,294
August 202464,072
July 202440,017
June 202442,185
May 202449,079
April 202458,733
March 202452,992
February 202464,663
January 202442,140

Source: EIA Form EIA-923, through August 2026.

How much of Oklahoma's electricity comes from the Frontier Windpower II plant?

Frontier Windpower II made 0.6% of the 89,758,877 MWh reported by Oklahoma plants in 2025, from 1.0% of the state's 35,828 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 21st largest of 143 plants in Oklahoma, the 920th largest of 14,327 in the U.S. and the 34th largest of 1,358 wind plants. By 2025 generation it is the 43rd largest of 135 generating plants in the state.

Frontier Windpower II within Oklahoma, 2025
MeasureThis plantOklahomaShare
Capacity (MW)35235,8281.0%
Generation (MWh)545,15589,758,8770.6%
Wind capacity (MW)35213,3442.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Frontier Windpower II plant, and when do they retire?

1 operable generator totals 352 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1352100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
FW2OperatingOnshore Wind Turbine3522021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Frontier Windpower II plant?

Frontier Windpower II, LLC is the only joint owner reported for Frontier Windpower II, with 100.0%. Deriva Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Frontier Windpower II plant?

Frontier Windpower II is in Blackwell, Kay County, Oklahoma, at 36.8248° N, 97.0298° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Oklahoma are similar in size?

Oklahoma has 69 operable wind plants with 13,344 MW of capacity, and Frontier Windpower II's 352 MW is 3% of that.

Wind plants in Oklahoma around this size
PlantCountyMW2025 MWh
Wagon Wheel WindLogan598181,246
Frontier Windpower IIKay352545,155
Diamond Spring, LLCJohnston304733,144
Caddo WindCaddo303983,724
Seven Cowboy Wind Project, LLCWashita3021,171,818

Source: EIA Forms EIA-860 and EIA-923, 2025.