Skip to main content
RateWatt

Biomass power plant, Mississippi

GCF US Holdings LLC Columbus Mill biomass power plant, Mississippi

GCF US Holdings LLC Columbus Mill is a 129 MW biomass power plant in Lowndes County, Mississippi, operated by GCF-Columbus Mill, and it generated 506,495 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Mississippi, and its capacity factor sits at the 36th percentile of U.S. biomass plants. By 2025 generation it ranks 1,324th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

129 MWNameplate capacity
40%Capacity factor, 2025, 36th percentile, on 129 MW net summer
0.7%Of MS generation, 2025
39 yearsAverage generator age, by MW

How hard does the GCF US Holdings LLC Columbus Mill plant run compared with other biomass plants?

The GCF US Holdings LLC Columbus Mill plant had a capacity factor of 40% in 2025 on 129 MW of net summer capacity, the 36th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 146 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
GCF US Holdings LLC Columbus Mill40%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the GCF US Holdings LLC Columbus Mill plant generating more or less than last year?

Generation at GCF US Holdings LLC Columbus Mill rose 17.8% from 2024 to 2025, from 429,990 MWh to 506,495 MWh. Through August 2026 it is running 9.5% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024429,990
2025506,495
2026 through August344,414
2025, same months314,433
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202648,034
July 202647,360
June 202645,323
May 202636,018
April 202616,879
March 202649,423
February 202647,611
January 202653,766
December 202547,407
November 202555,949
October 202544,787
September 202543,919
August 202542,420
July 202546,378
June 202537,411
May 202533,652
April 202515,895
March 202547,048
February 202540,937
January 202550,692
December 202438,151
November 202435,776
October 202433,115
September 202440,464
August 202432,663
July 202432,471
June 202434,587
May 202436,973
April 202435,855
March 202436,014
February 202436,311
January 202437,610

Source: EIA Form EIA-923, through August 2026.

How much of Mississippi's electricity comes from the GCF US Holdings LLC Columbus Mill plant?

GCF US Holdings LLC Columbus Mill made 0.7% of the 77,727,245 MWh reported by Mississippi plants in 2025, from 0.7% of the state's 17,862 MW of capacity. By capacity it is the 26th largest of 63 plants in Mississippi, the 2,236th largest of 14,327 in the U.S. and the 3rd largest of 585 biomass plants. By 2025 generation it is the 19th largest of 57 generating plants in the state.

GCF US Holdings LLC Columbus Mill within Mississippi, 2025
MeasureThis plantMississippiShare
Capacity (MW)12917,8620.7%
Generation (MWh)506,49577,727,2450.7%
Biomass capacity (MW)12931341.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the GCF US Holdings LLC Columbus Mill plant, and when do they retire?

4 operable generators total 129 MW, with an average age of 39 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s36550%none reported
1990s16450%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TG2OperatingWood/Wood Waste Biomass461982n/a
TG3OperatingWood/Wood Waste Biomass151982n/a
TG4On standbyWood/Wood Waste Biomass41987n/a
TG1OperatingWood/Wood Waste Biomass641990n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the GCF US Holdings LLC Columbus Mill plant?

EIA lists no joint owners for GCF US Holdings LLC Columbus Mill. GCF-Columbus Mill operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the GCF US Holdings LLC Columbus Mill plant?

GCF US Holdings LLC Columbus Mill is in Columbus, Lowndes County, Mississippi, at 33.3602° N, 88.4600° W. It sits in the Tennessee Valley Authority balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Mississippi are similar in size?

Mississippi has 5 operable biomass plants with 313 MW of capacity, and GCF US Holdings LLC Columbus Mill's 129 MW is 41% of that.

Biomass plants in Mississippi around this size
PlantCountyMW2025 MWh
GCF US Holdings LLC Columbus MillLowndes129450,109
Georgia-Pacific Monticello PaperLawrence82342,938