Natural gas power plant, Louisiana
Geismar Cogen natural gas power plant, Louisiana
Geismar Cogen is a 83.9 MW natural gas power plant in Ascension Parish, Louisiana, operated by Air Liquide Large Industries U S LP, and it generated 528,387 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Louisiana, and its capacity factor sits at the 95th percentile of U.S. natural gas plants. By 2025 generation it ranks 1,284th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Geismar Cogen plant run compared with other natural gas plants?
The Geismar Cogen plant had a capacity factor of 83% in 2025 on 72.5 MW of net summer capacity, the 95th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 304 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Geismar Cogen | 83% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Geismar Cogen plant generating more or less than last year?
Generation at Geismar Cogen fell 9.8% from 2024 to 2025, from 585,715 MWh to 528,387 MWh.
| Period | MWh |
|---|---|
| 2024 | 585,715 |
| 2025 | 528,387 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 42,596 |
| November 2025 | 42,996 |
| October 2025 | 43,843 |
| September 2025 | 47,637 |
| August 2025 | 51,004 |
| July 2025 | 52,308 |
| June 2025 | 48,597 |
| May 2025 | 44,917 |
| April 2025 | 33,635 |
| March 2025 | 37,951 |
| February 2025 | 38,307 |
| January 2025 | 44,596 |
| December 2024 | 45,180 |
| November 2024 | 45,312 |
| October 2024 | 46,654 |
| September 2024 | 48,856 |
| August 2024 | 55,072 |
| July 2024 | 60,241 |
| June 2024 | 53,438 |
| May 2024 | 50,090 |
| April 2024 | 46,132 |
| March 2024 | 42,396 |
| February 2024 | 39,511 |
| January 2024 | 52,832 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Geismar Cogen plant, and when do they retire?
1 operable generator totals 83.9 MW, with an average age of 25 years weighted by capacity at the end of 2025. 83.9 MW, 100% of operable capacity, has a planned retirement, the first in 2030.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 84 | 100% | 2030 |
| Year | Units | MW retiring | Share of plant |
|---|---|---|---|
| 2030 | 1 | 84 | 100% |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GTG | Operating | Natural Gas Fired Combustion Turbine | 84 | 2000 | 2030 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Geismar Cogen plant?
EIA lists no joint owners for Geismar Cogen. Air Liquide Large Industries U S LP operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Geismar Cogen plant?
Geismar Cogen is in Geismar, Ascension Parish, Louisiana, at 30.2090° N, 90.9921° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Louisiana are similar in size?
Louisiana has 50 operable natural gas plants with 19,086 MW of capacity, and Geismar Cogen's 83.9 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| ExxonMobil Baton Rouge Turbine Generator | East Baton Rouge | 85 | 552,449 |
| Atlantic Alumina, Gramercy Operations | St James | 85 | 180,696 |
| Geismar | Ascension | 84 | 534,736 |
| Geismar Cogen | Ascension | 84 | 528,387 |
| Shell Chemical | Ascension | 80 | 585,335 |
| Houma | Terrebonne | 79 | -1,069 |
| LEPA Unit No. 1 | St Mary | 74 | -4,972 |
Source: EIA Forms EIA-860 and EIA-923, 2025.