George Johnson is a 51 MW power plant, 50 MW of it natural gas, in Osceola County, Michigan, operated by Wolverine Power Supply Coop, and it generated 42,719 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 35th percentile of U.S. natural gas plants. By 2025 generation it ranks 4,275th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the George Johnson plant run compared with other natural gas plants?
The George Johnson plant's natural gas units had a capacity factor of 10% in 2025 on 50.8 MW of net summer capacity, the 35th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 35 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| George Johnson | 10% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.
Is the George Johnson plant generating more or less than last year?
Generation at George Johnson rose 25.5% from 2024 to 2025, from 34,032 MWh to 42,719 MWh.
| Period | MWh |
|---|---|
| 2024 | 34,032 |
| 2025 | 42,719 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 4,305 |
| November 2025 | 3,834 |
| October 2025 | 3,633 |
| September 2025 | 4,205 |
| August 2025 | 4,255 |
| July 2025 | 4,443 |
| June 2025 | 3,447 |
| May 2025 | 2,416 |
| April 2025 | 2,860 |
| March 2025 | 2,675 |
| February 2025 | 3,021 |
| January 2025 | 3,625 |
| December 2024 | 2,562 |
| November 2024 | 2,577 |
| October 2024 | 2,090 |
| September 2024 | 2,954 |
| August 2024 | 3,621 |
| July 2024 | 3,710 |
| June 2024 | 2,868 |
| May 2024 | 3,082 |
| April 2024 | 2,675 |
| March 2024 | 2,638 |
| February 2024 | 2,820 |
| January 2024 | 2,436 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the George Johnson plant, and when do they retire?
3 operable generators total 51 MW, with an average age of 25 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 8 have already retired, totalling 32 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1990s | 1 | 1 | 2% | none reported |
| 2000s | 2 | 50 | 98% | none reported |
Every generator, 11 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 11 | On standby | Petroleum Liquids | 1 | 1993 | n/a |
| 9 | Operating | Natural Gas Fired Combustion Turbine | 25 | 2000 | n/a |
| 10 | Operating | Natural Gas Fired Combustion Turbine | 25 | 2000 | n/a |
| 1 | Retired | Natural Gas Internal Combustion Engine | 1 | 1947 | 2002 |
| 2 | Retired | Natural Gas Internal Combustion Engine | 1 | 1948 | 2002 |
| 3 | Retired | Natural Gas Internal Combustion Engine | 1 | 1949 | 2002 |
| 4 | Retired | Natural Gas Internal Combustion Engine | 3 | 1951 | 2002 |
| 5 | Retired | Natural Gas Internal Combustion Engine | 3 | 1951 | 2002 |
| 6 | Retired | Natural Gas Internal Combustion Engine | 3 | 1952 | 2002 |
| 7 | Retired | Natural Gas Fired Combustion Turbine | 11 | 1973 | 2005 |
| 8 | Retired | Natural Gas Fired Combustion Turbine | 11 | 1973 | 2005 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the George Johnson plant?
EIA lists no joint owners for George Johnson. Wolverine Power Supply Coop operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the George Johnson plant use?
George Johnson has capacity on 2 fuels: 98% natural gas and 2% petroleum. In 2025, natural gas made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Natural gas | 50 | 98.0% | 42,719 |
| Petroleum | 1 | 2.0% | 0 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the George Johnson plant?
George Johnson is in Hersey, Osceola County, Michigan, at 43.8393° N, 85.4260° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Michigan are similar in size?
Michigan has 60 operable natural gas plants with 14,397 MW of capacity, and George Johnson's 50 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| University of Michigan | Washtenaw | 60 | 212,971 |
| A.J. Mihm Generating Station | Baraga | 56 | 184,546 |
| Marquette Energy Center | Marquette | 51 | 161,963 |
| George Johnson | Osceola | 50 | 42,719 |
| Wyandotte | Wayne | 44 | 0 |
| Dearborn Energy Center | Wayne | 35 | 237,289 |
| Ada Cogeneration LP | Kent | 33 | 184,857 |
Source: EIA Forms EIA-860 and EIA-923, 2025.