Solar power plant, Florida

Georges Lake solar power plant, Florida

Georges Lake is a 74.5 MW solar power plant in Putnam County, Florida, operated by Florida Power & Light Co, and it generated 185,290 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 85th percentile of U.S. solar plants. By 2025 generation it ranks 2,596th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
28%Capacity factor, 2025, 85th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
1 yearAverage generator age, by MW

How hard does the Georges Lake plant run compared with other solar plants?

The Georges Lake plant had a capacity factor of 28% in 2025 on 74.5 MW of net summer capacity, the 85th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 104 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Georges Lake28%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Georges Lake plant generating more or less than last year?

Georges Lake generated 185,290 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 5.9% behind the same months of 2025. 2024 has output for only 2 months, so the two years are not compared.

Net generation by period
PeriodMWh
202415,653
2025185,290
2026 through August123,868
2025, same months131,695
Monthly generation, Nov 2024 to Aug 2026
MonthMWh
August 202615,619
July 202616,896
June 202617,102
May 202617,148
April 202617,223
March 202615,912
February 202612,744
January 202611,224
December 202510,111
November 202513,681
October 202513,832
September 202515,971
August 202516,966
July 202517,658
June 202517,966
May 202518,930
April 202520,023
March 202517,381
February 202511,926
January 202510,845
December 202410,113
November 20245,540

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Georges Lake plant?

Georges Lake made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 718th largest of 7,223 solar plants. By 2025 generation it is the 81st largest of 313 generating plants in the state.

Georges Lake within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)185,290267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Georges Lake plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Georges Lake plant?

EIA lists no joint owners for Georges Lake. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Georges Lake, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Georges Lake plant?

Georges Lake is in TBD, Putnam County, Florida, at 29.7570° N, 81.7591° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Georges Lake's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Tenmile CreekCalhoun75182,057
KayakOkaloosa75181,244
Long CreekManatee75178,944
Georges LakePutnam75185,290
Norton CreekMadison75187,066
Hendry IslesHendry75173,056
Wild QuailWalton75166,194

Source: EIA Forms EIA-860 and EIA-923, 2025.