Natural gas power plant, New York

Glenwood Landing natural gas power plant, New York

Glenwood Landing is a 122 MW power plant, 106 MW of it natural gas, in Nassau County, New York, operated by National Grid Generation LLC, and it generated 136,975 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in New York, and its capacity factor sits at the 45th percentile of U.S. natural gas plants. By 2025 generation it ranks 3,041st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

122 MWNameplate capacity
17%Capacity factor, 2025, natural gas units, 45th percentile, on 85.1 MW net summer
0.1%Of NY generation, 2025
28 yearsAverage generator age, by MW

How hard does the Glenwood Landing plant run compared with other natural gas plants?

The Glenwood Landing plant's natural gas units had a capacity factor of 17% in 2025 on 85.1 MW of net summer capacity, the 45th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 63 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Glenwood Landing17%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.

Is the Glenwood Landing plant generating more or less than last year?

Generation at Glenwood Landing rose 6.0% from 2024 to 2025, from 129,198 MWh to 136,975 MWh.

Net generation by period
PeriodMWh
2024129,198
2025136,975
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025339
November 20252,578
October 20257,725
September 202514,450
August 202515,659
July 202525,574
June 202520,393
May 20259,238
April 20252,900
March 2025616
February 202515,562
January 202521,942
December 202415,432
November 20249,030
October 20248,451
September 20249,597
August 202411,590
July 202413,149
June 202410,154
May 20248,287
April 20247,347
March 202410,319
February 20248,563
January 202417,279

Source: EIA Form EIA-923, through August 2026.

How much of New York's electricity comes from the Glenwood Landing plant?

Glenwood Landing made 0.1% of the 130,607,810 MWh reported by New York plants in 2025, from 0.3% of the state's 44,194 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 49th largest of 1,145 plants in New York, the 2,294th largest of 14,327 in the U.S. and the 884th largest of 1,962 natural gas plants on its natural gas units alone. By 2025 generation it is the 77th largest of 1,049 generating plants in the state.

Glenwood Landing within New York, 2025
MeasureThis plantNew YorkShare
Capacity (MW)12244,1940.3%
Generation (MWh)136,975130,607,8100.1%
Natural gas capacity (MW)10624,2550.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Glenwood Landing plant, and when do they retire?

3 operable generators total 122 MW, with an average age of 28 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s11613%none reported
2000s210687%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GT1On standbyPetroleum Liquids161967n/a
GT4OperatingNatural Gas Fired Combustion Turbine532002n/a
GT5OperatingNatural Gas Fired Combustion Turbine532002n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Glenwood Landing plant?

EIA lists no joint owners for Glenwood Landing. National Grid Generation LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Glenwood Landing plant use?

Glenwood Landing has capacity on 2 fuels: 87% natural gas and 13% petroleum. In 2025, natural gas made 94% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Natural gas10686.9%128,331
Petroleum1613.1%8,644

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Glenwood Landing plant?

Glenwood Landing is in Glenwood Landing, Nassau County, New York, at 40.8275° N, 73.6478° W. It sits in the New York Independent System Operator balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in New York are similar in size?

New York has 104 operable natural gas plants with 24,255 MW of capacity, and Glenwood Landing's 106 MW is 0% of that.

Natural gas plants in New York around this size
PlantCountyMW2025 MWh
Equus Freeport PowerNassau12059,833
Greenidge Generation LLCYates112624,908
CH Resources Beaver FallsLewis10811,161
Glenwood LandingNassau106128,331
CH Resources SyracuseOnondaga10354,784
Massena Energy FacilitySt Lawrence10243,044
Edgewood Energy LLCSuffolk10032,086

Source: EIA Forms EIA-860 and EIA-923, 2025.