Wind power plant, New Hampshire

Granite Reliable Power wind power plant, New Hampshire

Granite Reliable Power is a 99 MW wind power plant in Coos County, New Hampshire, operated by NexteraEnergy, and it generated 193,139 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.0% of the generation reported in New Hampshire, and its capacity factor sits at the 15th percentile of U.S. wind plants. By 2025 generation it ranks 2,544th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

99 MWNameplate capacity
22%Capacity factor, 2025, 15th percentile, on 99 MW net summer
1.0%Of NH generation, 2025
13 yearsAverage generator age, by MW

How hard does the Granite Reliable Power plant run compared with other wind plants?

The Granite Reliable Power plant had a capacity factor of 22% in 2025 on 99 MW of net summer capacity, the 15th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 81 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Granite Reliable Power22%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Granite Reliable Power plant generating more or less than last year?

Generation at Granite Reliable Power rose 2.1% from 2024 to 2025, from 189,118 MWh to 193,139 MWh. Through August 2026 it is running 8.5% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024189,118
2025193,139
2026 through August136,142
2025, same months125,526
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202611,890
July 202617,900
June 202612,511
May 202620,629
April 202616,990
March 202621,588
February 202614,260
January 202620,374
December 202523,408
November 202516,711
October 202517,918
September 20259,576
August 20256,763
July 202510,833
June 202512,568
May 202512,983
April 202518,175
March 202518,132
February 202521,570
January 202524,502
December 202416,064
November 202423,245
October 202420,326
September 202412,543
August 20246,438
July 20249,995
June 202414,787
May 202411,439
April 202418,812
March 202421,311
February 202418,288
January 202415,870

Source: EIA Form EIA-923, through August 2026.

How much of New Hampshire's electricity comes from the Granite Reliable Power plant?

Granite Reliable Power made 1.0% of the 19,112,246 MWh reported by New Hampshire plants in 2025, from 2.2% of the state's 4,582 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 8th largest of 61 plants in New Hampshire, the 2,738th largest of 14,327 in the U.S. and the 698th largest of 1,358 wind plants. By 2025 generation it is the 8th largest of 57 generating plants in the state.

Granite Reliable Power within New Hampshire, 2025
MeasureThis plantNew HampshireShare
Capacity (MW)994,5822.2%
Generation (MWh)193,13919,112,2461.0%
Wind capacity (MW)9921446.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Granite Reliable Power plant, and when do they retire?

1 operable generator totals 99 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s199100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine992012n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Granite Reliable Power plant?

2 owners report shares in Granite Reliable Power; BAIF Granite Holdings LLC holds the largest named share, 89.5% or about 88.6 MW. NexteraEnergy operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
BAIF Granite Holdings LLC89.5%89172,821
Freshet Wind Energy LLC10.5%1020,318

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Granite Reliable Power plant?

Granite Reliable Power is in Dummer, Coos County, New Hampshire, at 44.7044° N, 71.2925° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.