Natural gas power plant, New Hampshire
Granite Ridge natural gas power plant, New Hampshire
Granite Ridge is a 790 MW natural gas power plant in Rockingham County, New Hampshire, operated by Granite Ridge Energy LLC, and it generated 3,398,436 MWh in 2025 (Forms EIA-860 and EIA-923). That is 17.8% of the generation reported in New Hampshire, and its capacity factor sits at the 76th percentile of U.S. natural gas plants. By 2025 generation it ranks 347th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Granite Ridge plant run compared with other natural gas plants?
The Granite Ridge plant had a capacity factor of 58% in 2025 on 668 MW of net summer capacity, the 76th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 212 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Granite Ridge | 58% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Granite Ridge plant generating more or less than last year?
Granite Ridge generated 3,398,436 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 24.3% ahead of the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 3,137,690 |
| 2025 | 3,398,436 |
| 2026 through August | 2,577,472 |
| 2025, same months | 2,073,519 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 445,018 |
| July 2026 | 434,770 |
| June 2026 | 319,001 |
| May 2026 | 152,489 |
| April 2026 | 209,634 |
| March 2026 | 266,731 |
| February 2026 | 359,447 |
| January 2026 | 390,382 |
| December 2025 | 390,439 |
| November 2025 | 151,130 |
| October 2025 | 432,777 |
| September 2025 | 350,571 |
| August 2025 | 356,708 |
| July 2025 | 417,975 |
| June 2025 | 333,147 |
| May 2025 | 257,297 |
| April 2025 | 245,324 |
| March 2025 | 21,910 |
| February 2025 | 162,672 |
| January 2025 | 278,486 |
| December 2024 | 176,724 |
| November 2024 | 0 |
| October 2024 | 395,259 |
| September 2024 | 420,931 |
| August 2024 | 439,488 |
| July 2024 | 38,962 |
| June 2024 | 384,670 |
| May 2024 | 273,974 |
| April 2024 | 231,843 |
| March 2024 | 229,880 |
| February 2024 | 191,941 |
| January 2024 | 354,018 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Granite Ridge plant, and when do they retire?
3 operable generators total 790 MW, with an average age of 22 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 3 | 790 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CT11 | Operating | Natural Gas Fired Combined Cycle | 260 | 2003 | n/a |
| CT12 | Operating | Natural Gas Fired Combined Cycle | 260 | 2003 | n/a |
| STG | Operating | Natural Gas Fired Combined Cycle | 270 | 2003 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Granite Ridge plant?
EIA lists no joint owners for Granite Ridge. Granite Ridge Energy LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Granite Ridge plant?
Granite Ridge is in Londonderry, Rockingham County, New Hampshire, at 42.9042° N, 71.4261° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in New Hampshire are similar in size?
New Hampshire has 3 operable natural gas plants with 1,401 MW of capacity, and Granite Ridge's 790 MW is 56% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Granite Ridge | Rockingham | 790 | 3,398,436 |
| Newington Energy Center | Rockingham | 606 | 1,828,217 |
Source: EIA Forms EIA-860 and EIA-923, 2025.