Solar power plant, Connecticut

Gravel Pit Solar, LLC power plant, Connecticut

Gravel Pit Solar, LLC is a 120 MW solar power plant in Hartford County, Connecticut, operated by Gravel Pit Solar, LLC, and it generated 146,463 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Connecticut, and its capacity factor sits at the 10th percentile of U.S. solar plants. By 2025 generation it ranks 2,939th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

120 MWNameplate capacity
14%Capacity factor, 2025, 10th percentile, on 120 MW net summer
0.3%Of CT generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Gravel Pit Solar, LLC plant run compared with other solar plants?

The Gravel Pit Solar, LLC plant had a capacity factor of 14% in 2025 on 120 MW of net summer capacity, the 10th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 51 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Gravel Pit Solar, LLC14%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Gravel Pit Solar, LLC plant generating more or less than last year?

Gravel Pit Solar, LLC generated 146,463 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 54.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
2025146,463
2026 through August145,874
2025, same months94,227
Monthly generation, Feb 2025 to Aug 2026
MonthMWh
August 202622,395
July 202624,007
June 202625,368
May 202622,272
April 202621,469
March 202616,289
February 20267,094
January 20266,980
December 20256,560
November 202510,604
October 202516,457
September 202518,615
August 202529,061
July 202515,993
June 202515,368
May 202513,935
April 202512,840
March 20256,676
February 2025354

Source: EIA Form EIA-923, through August 2026.

How much of Connecticut's electricity comes from the Gravel Pit Solar, LLC plant?

Gravel Pit Solar, LLC made 0.3% of the 43,744,586 MWh reported by Connecticut plants in 2025, from 1.1% of the state's 10,990 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 15th largest of 182 plants in Connecticut, the 2,315th largest of 14,327 in the U.S. and the 383rd largest of 7,223 solar plants. By 2025 generation it is the 11th largest of 168 generating plants in the state.

Gravel Pit Solar, LLC within Connecticut, 2025
MeasureThis plantConnecticutShare
Capacity (MW)12010,9901.1%
Generation (MWh)146,46343,744,5860.3%
Solar capacity (MW)12049024.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Gravel Pit Solar, LLC plant, and when do they retire?

2 operable generators total 120 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2120100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GPS03OperatingSolar Photovoltaic502025n/a
GPS04OperatingSolar Photovoltaic702025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Gravel Pit Solar, LLC plant?

EIA lists no joint owners for Gravel Pit Solar, LLC. Gravel Pit Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Gravel Pit Solar, LLC plant?

Gravel Pit Solar, LLC is in East Windsor, Hartford County, Connecticut, at 41.8889° N, 72.5490° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.