Grays Harbor Energy Facility is a 715 MW natural gas power plant in Grays Harbor County, Washington, operated by Invenergy Services LLC, and it generated 3,649,445 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.6% of the generation reported in Washington, and its capacity factor sits at the 85th percentile of U.S. natural gas plants. By 2025 generation it ranks 321st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

715 MWNameplate capacity
70%Capacity factor, 2025, 85th percentile, on 595 MW net summer
3.6%Of WA generation, 2025
17 yearsAverage generator age, by MW

How hard does the Grays Harbor Energy Facility plant run compared with other natural gas plants?

The Grays Harbor Energy Facility plant had a capacity factor of 70% in 2025 on 595 MW of net summer capacity, the 85th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 256 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Grays Harbor Energy Facility70%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Grays Harbor Energy Facility plant generating more or less than last year?

Grays Harbor Energy Facility generated 3,649,445 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 77.7% behind the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
20242,779,650
20253,649,445
2026 through August549,917
2025, same months2,467,832
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026304,928
July 2026198,681
June 202638,279
May 20262,139
April 20260
March 20260
February 20260
January 20265,890
December 2025225,086
November 202530,952
October 2025477,369
September 2025448,206
August 2025309,145
July 2025469,557
June 2025285,682
May 202563,180
April 2025384,398
March 2025246,882
February 2025319,588
January 2025389,400
December 2024115,890
November 2024101,029
October 2024265,321
September 2024376,664
August 2024353,029
July 2024404,725
June 2024178,625
May 20240
April 2024224,925
March 2024188,316
February 2024289,291
January 2024281,835

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Grays Harbor Energy Facility plant?

Grays Harbor Energy Facility made 3.6% of the 101,512,862 MWh reported by Washington plants in 2025, from 2.3% of the state's 31,712 MW of capacity. Its share of output is 1.6 times its share of capacity. By capacity it is the 13th largest of 139 plants in Washington, the 471st largest of 14,327 in the U.S. and the 266th largest of 1,962 natural gas plants. By 2025 generation it is the 8th largest of 129 generating plants in the state.

Grays Harbor Energy Facility within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)71531,7122.3%
Generation (MWh)3,649,445101,512,8623.6%
Natural gas capacity (MW)7154,03517.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Grays Harbor Energy Facility plant, and when do they retire?

3 operable generators total 715 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s3715100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CT1OperatingNatural Gas Fired Combined Cycle1992008n/a
CT2OperatingNatural Gas Fired Combined Cycle1992008n/a
ST1OperatingNatural Gas Fired Combined Cycle3172008n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Grays Harbor Energy Facility plant?

EIA lists no joint owners for Grays Harbor Energy Facility. Invenergy Services LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Grays Harbor Energy Facility plant?

Grays Harbor Energy Facility is in Elma, Grays Harbor County, Washington, at 46.9692° N, 123.4800° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Washington are similar in size?

Washington has 16 operable natural gas plants with 4,035 MW of capacity, and Grays Harbor Energy Facility's 715 MW is 18% of that.

Natural gas plants in Washington around this size
PlantCountyMW2025 MWh
Grays Harbor Energy FacilityGrays Harbor7153,649,445
Chehalis Generating FacilityLewis5932,337,422
Fredonia (WA)Skagit376107,428

Source: EIA Forms EIA-860 and EIA-923, 2025.