Natural gas power plant, California
Grayson natural gas power plant, California
Grayson is a 57.4 MW natural gas power plant in Los Angeles County, California, operated by City of Glendale-(CA), and it generated 14,434 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 19th percentile of U.S. natural gas plants. By 2025 generation it ranks 5,606th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Grayson plant run compared with other natural gas plants?
The Grayson plant had a capacity factor of 3% in 2025 on 48 MW of net summer capacity, the 19th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 13 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Grayson | 3% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Grayson plant generating more or less than last year?
Grayson generated 14,434 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 0.6% behind the same months of 2025. 2024 has output for only 10 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 46,962 |
| 2025 | 14,434 |
| 2026 through August | 10,425 |
| 2025, same months | 10,493 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 8,113 |
| July 2026 | 1,163 |
| June 2026 | 213 |
| May 2026 | 321 |
| April 2026 | 0 |
| March 2026 | 0 |
| February 2026 | 615 |
| January 2026 | 0 |
| December 2025 | 442 |
| November 2025 | 0 |
| October 2025 | 0 |
| September 2025 | 3,499 |
| August 2025 | 1,791 |
| July 2025 | 1,297 |
| June 2025 | 648 |
| May 2025 | 0 |
| April 2025 | 2,146 |
| March 2025 | 4,611 |
| February 2025 | 0 |
| January 2025 | 0 |
| December 2024 | 811 |
| November 2024 | 0 |
| October 2024 | 3,260 |
| September 2024 | 8,501 |
| August 2024 | 15,436 |
| July 2024 | 13,254 |
| June 2024 | 2,410 |
| May 2024 | 0 |
| April 2024 | 134 |
| March 2024 | 1,504 |
| February 2024 | 985 |
| January 2024 | 667 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Grayson plant, and when do they retire?
1 operable generator totals 57.4 MW, with an average age of 21 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 4 more are proposed, totalling 131 MW. 9 have already retired, totalling 297 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 57 | 100% | none reported |
Every generator, 14 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 9 | Operating | Natural Gas Fired Combustion Turbine | 57 | 2004 | n/a |
| 10 | Under construction, over half built | Batteries | 75 | 2026 | n/a |
| 11 | Under construction, over half built | Natural Gas Internal Combustion Engine | 19 | 2026 | n/a |
| 12 | Under construction, over half built | Natural Gas Internal Combustion Engine | 19 | 2026 | n/a |
| 13 | Under construction, over half built | Natural Gas Internal Combustion Engine | 19 | 2026 | n/a |
| 3 | Retired | Natural Gas Steam Turbine | 23 | 1953 | 2023 |
| 4 | Retired | Natural Gas Steam Turbine | 50 | 1959 | 2023 |
| 5 | Retired | Natural Gas Steam Turbine | 50 | 1964 | 2023 |
| 6 | Retired | Natural Gas Fired Combustion Turbine | 22 | 1972 | 2004 |
| 7 | Retired | Natural Gas Fired Combustion Turbine | 31 | 1974 | 2002 |
| 1 | Retired | Natural Gas Fired Combined Cycle | 20 | 1977 | 2023 |
| 2 | Retired | Natural Gas Fired Combined Cycle | 20 | 1977 | 2023 |
| 8A | Retired | Natural Gas Fired Combined Cycle | 25 | 1977 | 2023 |
| 8BC | Retired | Natural Gas Fired Combined Cycle | 55 | 1977 | 2023 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Grayson plant?
EIA lists no joint owners for Grayson. City of Glendale-(CA) operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does City of Glendale charge homes?
City of Glendale, the operator of Grayson, had an average residential price of 35.51¢ per kWh and an average bill of $139 a month in 2025, 13% above the California average of 31.35¢.
| Measure | Price | Monthly bill | Against California |
|---|---|---|---|
| City of Glendale | 35.51¢ | $139 | 13% higher |
| California average | 31.35¢ | $155 | |
| U.S. average | 17.23¢ | $151 | 45% lower |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the Grayson plant?
Grayson is in Glendale, Los Angeles County, California, at 34.1556° N, 118.2782° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in California are similar in size?
California has 304 operable natural gas plants with 40,211 MW of capacity, and Grayson's 57.4 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Delano Energy Center | Tulare | 61 | 2,394 |
| CalPeak Power Enterprise Peaker Plant | San Diego | 59 | 2,206 |
| Ellwood | Santa Barbara | 58 | 305 |
| Grayson | Los Angeles | 57 | 14,434 |
| THUMS | Los Angeles | 57 | 168,216 |
| Wellhead Power Panoche | Fresno | 57 | 6,788 |
| Carson Cogeneration | Los Angeles | 56 | 2,562 |
Source: EIA Forms EIA-860 and EIA-923, 2025.