Skip to main content
RateWatt

Solar power plant, Pennsylvania

Great Cove Solar II power plant, Pennsylvania

Great Cove Solar II is a 150 MW solar power plant in Franklin County, Pennsylvania, operated by AES Clean Energy, and it generated 244,822 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Pennsylvania, and its capacity factor sits at the 19th percentile of U.S. solar plants. By 2025 generation it ranks 2,254th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

150 MWNameplate capacity
19%Capacity factor, 2025, 19th percentile, on 150 MW net summer
0.1%Of PA generation, 2025
2 yearsAverage generator age, by MW

How hard does the Great Cove Solar II plant run compared with other solar plants?

The Great Cove Solar II plant had a capacity factor of 19% in 2025 on 150 MW of net summer capacity, the 19th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 68 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Great Cove Solar II19%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Great Cove Solar II plant generating more or less than last year?

Great Cove Solar II generated 244,822 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 10.7% ahead of the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
202495,178
2025244,822
2026 through August197,886
2025, same months178,769
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202628,365
July 202630,847
June 202633,639
May 202627,987
April 202628,621
March 202620,706
February 202615,287
January 202612,434
December 20258,882
November 202512,861
October 202520,984
September 202523,326
August 202529,984
July 202531,538
June 202527,020
May 202523,865
April 202522,587
March 202521,617
February 202512,692
January 20259,466
December 20244,983
November 20246,585
October 20249,650
September 20249,958
August 202418,879
July 202415,367
June 202417,036
May 20243,764
April 20240
March 20241,501
February 20245,011
January 20242,444

Source: EIA Form EIA-923, through August 2026.

How much of Pennsylvania's electricity comes from the Great Cove Solar II plant?

Great Cove Solar II made 0.1% of the 245,706,645 MWh reported by Pennsylvania plants in 2025, from 0.3% of the state's 53,097 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 48th largest of 273 plants in Pennsylvania, the 1,967th largest of 14,327 in the U.S. and the 294th largest of 7,223 solar plants. By 2025 generation it is the 57th largest of 253 generating plants in the state.

Great Cove Solar II within Pennsylvania, 2025
MeasureThis plantPennsylvaniaShare
Capacity (MW)15053,0970.3%
Generation (MWh)244,822245,706,6450.1%
Solar capacity (MW)1501,13113.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Great Cove Solar II plant, and when do they retire?

1 operable generator totals 150 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GC2OperatingSolar Photovoltaic1502023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Great Cove Solar II plant?

EIA lists no joint owners for Great Cove Solar II. AES Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Great Cove Solar II plant?

Great Cove Solar II is in Saint Thomas, Franklin County, Pennsylvania, at 39.9016° N, 77.8682° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Pennsylvania are similar in size?

Pennsylvania has 74 operable solar plants with 1,131 MW of capacity, and Great Cove Solar II's 150 MW is 13% of that.

Solar plants in Pennsylvania around this size
PlantCountyMW2025 MWh
Great Cove Solar IIFranklin150244,822
Aspen Road SolarFranklin100163,044
CPV Maple Hill SolarCambria100155,717
Adams Solar LLC PAAdams80141,177

Source: EIA Forms EIA-860 and EIA-923, 2025.