Natural gas power plant, Texas

Green Power 2 natural gas power plant, Texas

Green Power 2 is a 861 MW natural gas power plant in Galveston County, Texas, operated by South Houston Green Power LLC, and it generated 3,861,166 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Texas, and its capacity factor sits at the 85th percentile of U.S. natural gas plants. By 2025 generation it ranks 301st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

861 MWNameplate capacity
70%Capacity factor, 2025, 85th percentile, on 624 MW net summer
0.7%Of TX generation, 2025
20 yearsAverage generator age, by MW

How hard does the Green Power 2 plant run compared with other natural gas plants?

The Green Power 2 plant had a capacity factor of 70% in 2025 on 624 MW of net summer capacity, the 85th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 257 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Green Power 270%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Green Power 2 plant generating more or less than last year?

Generation at Green Power 2 fell 0.5% from 2024 to 2025, from 3,879,135 MWh to 3,861,166 MWh. Through August 2026 it is running 12.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20243,879,135
20253,861,166
2026 through August2,797,985
2025, same months2,493,504
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026347,624
July 2026343,446
June 2026318,711
May 2026382,342
April 2026371,316
March 2026365,478
February 2026294,793
January 2026374,275
December 2025406,451
November 2025362,754
October 2025274,230
September 2025324,227
August 2025338,815
July 2025319,255
June 2025297,575
May 2025277,486
April 2025299,351
March 2025288,974
February 2025303,745
January 2025368,303
December 2024350,641
November 2024333,985
October 2024260,007
September 2024295,426
August 2024349,826
July 2024260,531
June 2024367,960
May 2024384,722
April 2024328,970
March 2024287,903
February 2024310,285
January 2024348,879

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Green Power 2 plant?

Green Power 2 made 0.7% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.4% of the state's 195,966 MW of capacity. Its share of output is 1.5 times its share of capacity. By capacity it is the 45th largest of 1,023 plants in Texas, the 372nd largest of 14,327 in the U.S. and the 199th largest of 1,962 natural gas plants. By 2025 generation it is the 34th largest of 816 generating plants in the state.

Green Power 2 within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)861195,9660.4%
Generation (MWh)3,861,166592,896,1760.7%
Natural gas capacity (MW)86181,5741.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Green Power 2 plant, and when do they retire?

5 operable generators total 861 MW, with an average age of 20 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s5861100%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ST1OperatingNatural Gas Fired Combined Cycle1102003n/a
TR1OperatingNatural Gas Fired Combined Cycle1672003n/a
TR2OperatingNatural Gas Fired Combined Cycle1672003n/a
TR3OperatingNatural Gas Fired Combined Cycle1672003n/a
ST805Out of serviceNatural Gas Fired Combined Cycle2502009n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Green Power 2 plant?

Marathon Petroleum Company LP is the only joint owner reported for Green Power 2, with 100.0%. South Houston Green Power LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Green Power 2 plant?

Green Power 2 is in Texas City, Galveston County, Texas, at 29.3781° N, 94.9328° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Texas are similar in size?

Texas has 305 operable natural gas plants with 81,574 MW of capacity, and Green Power 2's 861 MW is 1% of that.

Natural gas plants in Texas around this size
PlantCountyMW2025 MWh
Channelview Cogeneration PlantHarris9185,495,755
O W SommersBexar8922,278,173
WilkesMarion882995,424
Green Power 2Galveston8613,852,343
JonesLubbock8602,931,803
Mountain CreekDallas852546,347
Wise County Power LLCWise8223,331,690

Source: EIA Forms EIA-860 and EIA-923, 2025.