Hydro power plant, Washington

H M Jackson hydroelectric power plant, Washington

H M Jackson is a 112 MW hydro power plant in Snohomish County, Washington, operated by PUD No 1 of Snohomish County-(WA), and it generated 333,608 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Washington, and its capacity factor sits at the 65th percentile of U.S. hydro plants. By 2025 generation it ranks 1,833rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

112 MWNameplate capacity
40%Capacity factor, 2025, 65th percentile, on 96 MW net summer
0.3%Of WA generation, 2025
41 yearsAverage generator age, by MW

How hard does the H M Jackson plant run compared with other hydro plants?

The H M Jackson plant had a capacity factor of 40% in 2025 on 96 MW of net summer capacity, the 65th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 145 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
H M Jackson40%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the H M Jackson plant generating more or less than last year?

Generation at H M Jackson fell 8.8% from 2024 to 2025, from 365,712 MWh to 333,608 MWh.

Net generation by period
PeriodMWh
2024365,712
2025333,608
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202568,774
November 202540,738
October 202521,406
September 202516,788
August 202518,873
July 202518,174
June 202514,394
May 202511,574
April 202540,489
March 202532,078
February 202515,417
January 202534,903
December 202449,000
November 202445,398
October 202425,627
September 202410,689
August 202420,235
July 202417,787
June 202425,366
May 202430,353
April 202432,151
March 202433,377
February 202427,125
January 202448,604

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the H M Jackson plant?

H M Jackson made 0.3% of the 101,512,862 MWh reported by Washington plants in 2025, from 0.4% of the state's 31,712 MW of capacity. By capacity it is the 50th largest of 139 plants in Washington, the 2,420th largest of 14,327 in the U.S. and the 136th largest of 1,393 hydro plants. By 2025 generation it is the 49th largest of 129 generating plants in the state.

H M Jackson within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)11231,7120.4%
Generation (MWh)333,608101,512,8620.3%
Hydro capacity (MW)11221,4620.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the H M Jackson plant, and when do they retire?

4 operable generators total 112 MW, with an average age of 41 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s4112100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric481984n/a
2OperatingConventional Hydroelectric481984n/a
3OperatingConventional Hydroelectric81984n/a
4OperatingConventional Hydroelectric81984n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the H M Jackson plant?

EIA lists no joint owners for H M Jackson. PUD No 1 of Snohomish County-(WA) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does PUD No 1 of Snohomish County charge homes?

PUD No 1 of Snohomish County, the operator of H M Jackson, had an average residential price of 12.08¢ per kWh and an average bill of $113 a month in 2025, 8% below the Washington average of 13.17¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Washington
PUD No 1 of Snohomish County12.08¢$1138% lower
Washington average13.17¢$124
U.S. average17.23¢$15131% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the H M Jackson plant?

H M Jackson is in Sultan, Snohomish County, Washington, at 47.9084° N, 121.8144° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Washington are similar in size?

Washington has 73 operable hydro plants with 21,462 MW of capacity, and H M Jackson's 112 MW is 1% of that.

Hydro plants in Washington around this size
PlantCountyMW2025 MWh
MayfieldLewis162602,506
MerwinCowlitz136422,567
YaleCowlitz134472,460
H M JacksonSnohomish112333,608
Upper BakerWhatcom105332,702
Lower BakerSkagit104364,775
Summer Falls Power PlantGrant92391,151

Source: EIA Forms EIA-860 and EIA-923, 2025.