Wind power plant, Indiana

Headwaters Wind Farm II LLC power plant, Indiana

Headwaters Wind Farm II LLC is a 200 MW wind power plant in Randolph County, Indiana, operated by EDP Renewables North America LLC, and it generated 554,446 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Indiana, and its capacity factor sits at the 46th percentile of U.S. wind plants. By 2025 generation it ranks 1,229th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
32%Capacity factor, 2025, 46th percentile, on 200 MW net summer
0.5%Of IN generation, 2025
4 yearsAverage generator age, by MW

How hard does the Headwaters Wind Farm II LLC plant run compared with other wind plants?

The Headwaters Wind Farm II LLC plant had a capacity factor of 32% in 2025 on 200 MW of net summer capacity, the 46th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 116 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Headwaters Wind Farm II LLC32%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Headwaters Wind Farm II LLC plant generating more or less than last year?

Generation at Headwaters Wind Farm II LLC rose 0.3% from 2024 to 2025, from 552,565 MWh to 554,446 MWh. Through August 2026 it is running 6.5% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024552,565
2025554,446
2026 through August390,213
2025, same months366,472
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202619,992
July 202616,640
June 202636,368
May 202647,371
April 202671,770
March 202677,910
February 202649,280
January 202670,882
December 202569,179
November 202560,233
October 202545,895
September 202512,667
August 202517,080
July 202517,918
June 202529,999
May 202545,337
April 202558,162
March 202582,294
February 202550,149
January 202565,533
December 202465,064
November 202460,755
October 202444,404
September 202426,123
August 202420,652
July 202421,947
June 202438,023
May 202433,557
April 202461,458
March 202465,430
February 202455,797
January 202459,355

Source: EIA Form EIA-923, through August 2026.

How much of Indiana's electricity comes from the Headwaters Wind Farm II LLC plant?

Headwaters Wind Farm II LLC made 0.5% of the 106,870,299 MWh reported by Indiana plants in 2025, from 0.6% of the state's 33,631 MW of capacity. By capacity it is the 37th largest of 221 plants in Indiana, the 1,524th largest of 14,327 in the U.S. and the 310th largest of 1,358 wind plants. By 2025 generation it is the 31st largest of 207 generating plants in the state.

Headwaters Wind Farm II LLC within Indiana, 2025
MeasureThis plantIndianaShare
Capacity (MW)20033,6310.6%
Generation (MWh)554,446106,870,2990.5%
Wind capacity (MW)2003,8575.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Headwaters Wind Farm II LLC plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
HWIIOperatingOnshore Wind Turbine2002021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Headwaters Wind Farm II LLC plant?

EIA lists no joint owners for Headwaters Wind Farm II LLC. EDP Renewables North America LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Headwaters Wind Farm II LLC plant?

Headwaters Wind Farm II LLC is in Losanville, Randolph County, Indiana, at 40.0517° N, 85.2067° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Indiana are similar in size?

Indiana has 20 operable wind plants with 3,857 MW of capacity, and Headwaters Wind Farm II LLC's 200 MW is 5% of that.

Wind plants in Indiana around this size
PlantCountyMW2025 MWh
Carpenter Wind Farm LLCJasper20067,216
Wildcat Wind Farm I, LLCTipton200671,709
Headwaters Wind Farm LLCRandolph200642,258
Headwaters Wind Farm II LLCRandolph200554,446
Meadow Lake Wind Farm LLCWhite200431,723
Fowler Ridge IV Wind Farm LLCBenton150427,397
Bitter Ridge Wind Farm, LLCJay147359,751

Source: EIA Forms EIA-860 and EIA-923, 2025.