Wind power plant, Kansas
High Banks Wind power plant, Kansas
High Banks Wind is a 643 MW wind power plant in Republic County, Kansas, operated by High Banks Wind, LLC, and it generated 2,519,732 MWh in 2025 (Forms EIA-860 and EIA-923). That is 4.1% of the generation reported in Kansas, and its capacity factor sits at the 97th percentile of U.S. wind plants. By 2025 generation it ranks 439th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the High Banks Wind plant run compared with other wind plants?
The High Banks Wind plant had a capacity factor of 48% in 2025 on 604 MW of net summer capacity, the 97th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 174 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| High Banks Wind | 48% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the High Banks Wind plant generating more or less than last year?
Generation at High Banks Wind fell 1.0% from 2024 to 2025, from 2,545,176 MWh to 2,519,732 MWh. Through August 2026 it is running 3.3% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 2,545,176 |
| 2025 | 2,519,732 |
| 2026 through August | 1,600,536 |
| 2025, same months | 1,655,023 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 152,908 |
| July 2026 | 144,500 |
| June 2026 | 170,927 |
| May 2026 | 203,312 |
| April 2026 | 270,967 |
| March 2026 | 280,046 |
| February 2026 | 183,670 |
| January 2026 | 194,206 |
| December 2025 | 225,588 |
| November 2025 | 214,821 |
| October 2025 | 261,749 |
| September 2025 | 162,551 |
| August 2025 | 168,928 |
| July 2025 | 175,585 |
| June 2025 | 194,410 |
| May 2025 | 187,534 |
| April 2025 | 263,325 |
| March 2025 | 260,628 |
| February 2025 | 200,705 |
| January 2025 | 203,908 |
| December 2024 | 199,429 |
| November 2024 | 243,886 |
| October 2024 | 249,740 |
| September 2024 | 204,857 |
| August 2024 | 159,494 |
| July 2024 | 164,377 |
| June 2024 | 234,779 |
| May 2024 | 200,438 |
| April 2024 | 241,889 |
| March 2024 | 257,842 |
| February 2024 | 226,851 |
| January 2024 | 161,594 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the High Banks Wind plant, and when do they retire?
1 operable generator totals 643 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 643 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WT | Operating | Onshore Wind Turbine | 643 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the High Banks Wind plant?
EIA lists no joint owners for High Banks Wind. High Banks Wind, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the High Banks Wind plant?
High Banks Wind is in Belleville, Republic County, Kansas, at 39.8160° N, 97.4310° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Kansas are similar in size?
Kansas has 52 operable wind plants with 9,714 MW of capacity, and High Banks Wind's 643 MW is 7% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| High Banks Wind | Republic | 643 | 2,519,732 |
| Flat Ridge 2 Wind Energy LLC | Kingman | 470 | 1,020,654 |
Source: EIA Forms EIA-860 and EIA-923, 2025.