Natural gas power plant, California
High Desert Power Plant, California
High Desert Power Plant is a 960 MW natural gas power plant in San Bernardino County, California, operated by MRP Generation Holdings, LLC, and it generated 3,333,774 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.6% of the generation reported in California, and its capacity factor sits at the 67th percentile of U.S. natural gas plants. By 2025 generation it ranks 357th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does High Desert Power Plant run compared with other natural gas plants?
High Desert Power Plant had a capacity factor of 43% in 2025 on 889 MW of net summer capacity, the 67th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 156 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| High Desert Power Plant | 43% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is High Desert Power Plant generating more or less than last year?
Generation at High Desert Power Plant fell 27.5% from 2024 to 2025, from 4,596,087 MWh to 3,333,774 MWh. Through August 2026 it is running 0.6% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 4,596,087 |
| 2025 | 3,333,774 |
| 2026 through August | 1,721,584 |
| 2025, same months | 1,710,740 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 545,686 |
| July 2026 | 434,035 |
| June 2026 | 123,470 |
| May 2026 | 118,738 |
| April 2026 | 68,884 |
| March 2026 | 219,124 |
| February 2026 | 0 |
| January 2026 | 211,647 |
| December 2025 | 329,686 |
| November 2025 | 470,762 |
| October 2025 | 412,102 |
| September 2025 | 410,484 |
| August 2025 | 501,861 |
| July 2025 | 430,625 |
| June 2025 | 306,368 |
| May 2025 | 124,342 |
| April 2025 | 0 |
| March 2025 | 38 |
| February 2025 | 0 |
| January 2025 | 347,506 |
| December 2024 | 522,780 |
| November 2024 | 431,904 |
| October 2024 | 406,411 |
| September 2024 | 459,462 |
| August 2024 | 546,465 |
| July 2024 | 531,900 |
| June 2024 | 316,487 |
| May 2024 | 153,908 |
| April 2024 | 75,658 |
| March 2024 | 318,656 |
| February 2024 | 404,709 |
| January 2024 | 427,747 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at High Desert Power Plant, and when do they retire?
4 operable generators total 960 MW, with an average age of 22 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 4 | 960 | 100% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CTG1 | Operating | Natural Gas Fired Combined Cycle | 209 | 2003 | n/a |
| CTG2 | Operating | Natural Gas Fired Combined Cycle | 209 | 2003 | n/a |
| CTG3 | Operating | Natural Gas Fired Combined Cycle | 209 | 2003 | n/a |
| STG1 | Operating | Natural Gas Fired Combined Cycle | 333 | 2003 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns High Desert Power Plant?
EIA lists no joint owners for High Desert Power Plant. MRP Generation Holdings, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is High Desert Power Plant?
High Desert Power Plant is in Victorville, San Bernardino County, California, at 34.5953° N, 117.3647° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in California are similar in size?
California has 304 operable natural gas plants with 40,211 MW of capacity, and High Desert Power Plant's 960 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| La Paloma Generating Plant | Kern | 1,156 | 1,706,371 |
| AES Alamitos LLC | Los Angeles | 1,115 | 28,213 |
| Mountainview Generating Station | San Bernardino | 1,037 | 1,371,673 |
| High Desert Power Plant | San Bernardino | 960 | 3,333,774 |
| Delta Energy Center | Contra Costa | 944 | 4,137,805 |
| Scattergood | Los Angeles | 876 | 1,664,827 |
| Marsh Landing Generating Station | Contra Costa | 828 | 15,664 |
Source: EIA Forms EIA-860 and EIA-923, 2025.