Solar power plant, Colorado
High Mesa CO solar power plant, Colorado
High Mesa CO is a 22.4 MW power plant, 11.2 MW of it solar, in Garfield County, Colorado, operated by AES Clean Energy, and it generated 15,299 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 8th percentile of U.S. solar plants. By 2025 generation it ranks 5,543rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the High Mesa CO plant run compared with other solar plants?
The High Mesa CO plant's solar units had a capacity factor of 11% in 2025 on 16.3 MW of net summer capacity, the 8th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 40 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| High Mesa CO | 11% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the High Mesa CO plant generating more or less than last year?
High Mesa CO generated 15,299 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 15,299 |
Monthly generation, Jan 2025 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 1,190 |
| November 2025 | 1,444 |
| October 2025 | 1,542 |
| September 2025 | 2,395 |
| August 2025 | 2,478 |
| July 2025 | 465 |
| June 2025 | 1,728 |
| May 2025 | 2,318 |
| April 2025 | 1,739 |
| March 2025 | 0 |
| February 2025 | 0 |
| January 2025 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the High Mesa CO plant, and when do they retire?
2 operable generators total 22.4 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 22 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| HMESS | Operating | Batteries | 11 | 2025 | n/a |
| HMSCO | Operating | Solar Photovoltaic | 11 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the High Mesa CO plant?
EIA lists no joint owners for High Mesa CO. AES Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the High Mesa CO plant use?
High Mesa CO has capacity on 2 fuels: 50% solar and 50% battery and pumped storage. In 2025, solar made 102% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 11 | 50.0% | 15,666 |
| Battery and pumped storage | 11 | 50.0% | -367 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the High Mesa CO plant?
High Mesa CO is in Parachute, Garfield County, Colorado, at 39.3959° N, 108.0733° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Colorado are similar in size?
Colorado has 181 operable solar plants with 3,263 MW of capacity, and High Mesa CO's 11.2 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Victory Solar LLC | Adams | 13 | 28,109 |
| CSWIND America Inc. | Pueblo | 12 | 26,956 |
| Mamm Creek | Garfield | 11 | 0 |
| High Mesa CO | Garfield | 11 | 15,666 |
| Overland | Weld | 11 | 22,070 |
| Clear Spring Ranch PV Project | El Paso | 10 | 17,207 |
| Wheeler Gulch Solar, LLC | Garfield | 10 | 17,456 |
Source: EIA Forms EIA-860 and EIA-923, 2025.