Natural gas power plant, Minnesota

Hutchinson Plant #2 natural gas power plant, Minnesota

Hutchinson Plant #2 is a 90.5 MW natural gas power plant in McLeod County, Minnesota, operated by Hutchinson Utilities Comm, and it generated 28,186 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 22nd percentile of U.S. natural gas plants. By 2025 generation it ranks 4,818th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

90.5 MWNameplate capacity
4%Capacity factor, 2025, 22nd percentile, on 73 MW net summer
4,818thU.S. rank by generation, 2025
29 yearsAverage generator age, by MW

How hard does the Hutchinson Plant #2 plant run compared with other natural gas plants?

The Hutchinson Plant #2 plant had a capacity factor of 4% in 2025 on 73 MW of net summer capacity, the 22nd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 16 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hutchinson Plant #24%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hutchinson Plant #2 plant generating more or less than last year?

Generation at Hutchinson Plant #2 rose 1887.7% from 2024 to 2025, from 1,418 MWh to 28,186 MWh.

Net generation by period
PeriodMWh
20241,418
202528,186
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202517
November 202516
October 202512
September 20252,627
August 20256,026
July 202511,229
June 20255,943
May 2025256
April 20251,403
March 2025631
February 202511
January 202514
December 2024265
November 20244
October 202483
September 20241,034
August 20246
July 20246
June 20244
May 20243
April 20243
March 20244
February 20244
January 20244

Source: EIA Form EIA-923, through August 2026.

How much of Minnesota's electricity comes from the Hutchinson Plant #2 plant?

Hutchinson Plant #2 made 0.0% of the 58,638,010 MWh reported by Minnesota plants in 2025, from 0.5% of the state's 19,860 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 52nd largest of 804 plants in Minnesota, the 2,846th largest of 14,327 in the U.S. and the 929th largest of 1,962 natural gas plants. By 2025 generation it is the 109th largest of 760 generating plants in the state.

Hutchinson Plant #2 within Minnesota, 2025
MeasureThis plantMinnesotaShare
Capacity (MW)9119,8600.5%
Generation (MWh)28,18658,638,0100.0%
Natural gas capacity (MW)916,3101.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hutchinson Plant #2 plant, and when do they retire?

3 operable generators total 90.5 MW, with an average age of 29 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 25 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s26672%none reported
2000s12528%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
2OperatingNatural Gas Fired Combined Cycle541994n/a
3OperatingNatural Gas Fired Combined Cycle121994n/a
9OperatingNatural Gas Fired Combustion Turbine252001n/a
1RetiredNatural Gas Fired Combustion Turbine2519771999

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hutchinson Plant #2 plant?

EIA lists no joint owners for Hutchinson Plant #2. Hutchinson Utilities Comm operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Hutchinson Utilities Comm charge homes?

Hutchinson Utilities Comm, the operator of Hutchinson Plant #2, had an average residential price of 11.02¢ per kWh and an average bill of $78 a month in 2025, 30% below the Minnesota average of 15.83¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Minnesota
Hutchinson Utilities Comm11.02¢$7830% lower
Minnesota average15.83¢$118
U.S. average17.23¢$1519% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Hutchinson Plant #2 plant?

Hutchinson Plant #2 is in Hutchinson, McLeod County, Minnesota, at 44.8889° N, 94.3493° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Minnesota are similar in size?

Minnesota has 34 operable natural gas plants with 6,310 MW of capacity, and Hutchinson Plant #2's 90.5 MW is 1% of that.

Natural gas plants in Minnesota around this size
PlantCountyMW2025 MWh
Cambridge CT HybridIsanti16992,321
Syl LaskinSt Louis116196,319
Hutchinson Plant #2McLeod9128,186
Cascade CreekOlmsted8532,182
Flint Hills Resources Pine Bend, LLCDakota73285,049
Solway CTBeltrami50142,154

Source: EIA Forms EIA-860 and EIA-923, 2025.