Ingleside Cogeneration natural gas power plant, Texas

Ingleside Cogeneration is a 517 MW natural gas power plant in San Patricio County, Texas, operated by Ingleside Cogeneration LP, and it generated 2,868,461 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Texas, and its capacity factor sits at the 85th percentile of U.S. natural gas plants. By 2025 generation it ranks 407th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

517 MWNameplate capacity
70%Capacity factor, 2025, 85th percentile, on 460 MW net summer
0.5%Of TX generation, 2025
26 yearsAverage generator age, by MW

How hard does the Ingleside Cogeneration plant run compared with other natural gas plants?

The Ingleside Cogeneration plant had a capacity factor of 70% in 2025 on 460 MW of net summer capacity, the 85th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 256 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Ingleside Cogeneration70%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Ingleside Cogeneration plant generating more or less than last year?

Generation at Ingleside Cogeneration rose 7.3% from 2024 to 2025, from 2,672,339 MWh to 2,868,461 MWh. Through August 2026 it is running 12.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20242,672,339
20252,868,461
2026 through August2,043,331
2025, same months1,811,223
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026275,020
July 2026261,868
June 2026270,376
May 2026215,038
April 2026280,613
March 2026268,423
February 2026201,260
January 2026270,733
December 2025272,268
November 2025269,328
October 2025283,385
September 2025232,257
August 2025281,754
July 2025265,201
June 2025248,116
May 2025247,945
April 2025242,244
March 2025255,161
February 2025120,129
January 2025150,673
December 2024281,330
November 2024273,217
October 2024224,307
September 2024271,675
August 2024300,478
July 2024283,544
June 2024225,771
May 2024117,605
April 202486,459
March 202491,665
February 2024251,516
January 2024264,772

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Ingleside Cogeneration plant?

Ingleside Cogeneration made 0.5% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.3% of the state's 195,966 MW of capacity. Its share of output is 1.8 times its share of capacity. By capacity it is the 91st largest of 1,023 plants in Texas, the 716th largest of 14,327 in the U.S. and the 450th largest of 1,962 natural gas plants. By 2025 generation it is the 50th largest of 816 generating plants in the state.

Ingleside Cogeneration within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)517195,9660.3%
Generation (MWh)2,868,461592,896,1760.5%
Natural gas capacity (MW)51781,5740.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Ingleside Cogeneration plant, and when do they retire?

3 operable generators total 517 MW, with an average age of 26 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s3517100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CTG1OperatingNatural Gas Fired Combined Cycle1701999n/a
CTG2OperatingNatural Gas Fired Combined Cycle1701999n/a
STGOperatingNatural Gas Fired Combined Cycle1771999n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Ingleside Cogeneration plant?

2 owners report shares in Ingleside Cogeneration; Oxy Cogener Holding Co Inc holds the largest named share, 98.0% or about 507 MW. Ingleside Cogeneration LP operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Oxy Cogener Holding Co Inc98.0%5072,811,092
Ingleside Cogeneration LP2.0%1057,369

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Ingleside Cogeneration plant?

Ingleside Cogeneration is in Houston, San Patricio County, Texas, at 27.8828° N, 97.2428° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Texas are similar in size?

Texas has 305 operable natural gas plants with 81,574 MW of capacity, and Ingleside Cogeneration's 517 MW is 1% of that.

Natural gas plants in Texas around this size
PlantCountyMW2025 MWh
Frontera Energy CenterHidalgo5291,958,986
Montana Power StationEl Paso527911,586
Mustang StationYoakum5212,496,112
Ingleside CogenerationSan Patricio5172,821,569
Oyster Creek Unit VIIIBrazoria4982,493,561
HO Clarke GeneratingHarris484335,520
Braes Bayou PlantFort Bend484190,064

Source: EIA Forms EIA-860 and EIA-923, 2025.