Natural gas power plant, Texas
Ingleside Cogeneration natural gas power plant, Texas
Ingleside Cogeneration is a 517 MW natural gas power plant in San Patricio County, Texas, operated by Ingleside Cogeneration LP, and it generated 2,868,461 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Texas, and its capacity factor sits at the 85th percentile of U.S. natural gas plants. By 2025 generation it ranks 407th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Ingleside Cogeneration plant run compared with other natural gas plants?
The Ingleside Cogeneration plant had a capacity factor of 70% in 2025 on 460 MW of net summer capacity, the 85th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 256 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Ingleside Cogeneration | 70% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Ingleside Cogeneration plant generating more or less than last year?
Generation at Ingleside Cogeneration rose 7.3% from 2024 to 2025, from 2,672,339 MWh to 2,868,461 MWh. Through August 2026 it is running 12.8% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 2,672,339 |
| 2025 | 2,868,461 |
| 2026 through August | 2,043,331 |
| 2025, same months | 1,811,223 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 275,020 |
| July 2026 | 261,868 |
| June 2026 | 270,376 |
| May 2026 | 215,038 |
| April 2026 | 280,613 |
| March 2026 | 268,423 |
| February 2026 | 201,260 |
| January 2026 | 270,733 |
| December 2025 | 272,268 |
| November 2025 | 269,328 |
| October 2025 | 283,385 |
| September 2025 | 232,257 |
| August 2025 | 281,754 |
| July 2025 | 265,201 |
| June 2025 | 248,116 |
| May 2025 | 247,945 |
| April 2025 | 242,244 |
| March 2025 | 255,161 |
| February 2025 | 120,129 |
| January 2025 | 150,673 |
| December 2024 | 281,330 |
| November 2024 | 273,217 |
| October 2024 | 224,307 |
| September 2024 | 271,675 |
| August 2024 | 300,478 |
| July 2024 | 283,544 |
| June 2024 | 225,771 |
| May 2024 | 117,605 |
| April 2024 | 86,459 |
| March 2024 | 91,665 |
| February 2024 | 251,516 |
| January 2024 | 264,772 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Ingleside Cogeneration plant, and when do they retire?
3 operable generators total 517 MW, with an average age of 26 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1990s | 3 | 517 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CTG1 | Operating | Natural Gas Fired Combined Cycle | 170 | 1999 | n/a |
| CTG2 | Operating | Natural Gas Fired Combined Cycle | 170 | 1999 | n/a |
| STG | Operating | Natural Gas Fired Combined Cycle | 177 | 1999 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Ingleside Cogeneration plant?
2 owners report shares in Ingleside Cogeneration; Oxy Cogener Holding Co Inc holds the largest named share, 98.0% or about 507 MW. Ingleside Cogeneration LP operates the plant.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| Oxy Cogener Holding Co Inc | 98.0% | 507 | 2,811,092 |
| Ingleside Cogeneration LP | 2.0% | 10 | 57,369 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
Where is the Ingleside Cogeneration plant?
Ingleside Cogeneration is in Houston, San Patricio County, Texas, at 27.8828° N, 97.2428° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Texas are similar in size?
Texas has 305 operable natural gas plants with 81,574 MW of capacity, and Ingleside Cogeneration's 517 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Frontera Energy Center | Hidalgo | 529 | 1,958,986 |
| Montana Power Station | El Paso | 527 | 911,586 |
| Mustang Station | Yoakum | 521 | 2,496,112 |
| Ingleside Cogeneration | San Patricio | 517 | 2,821,569 |
| Oyster Creek Unit VIII | Brazoria | 498 | 2,493,561 |
| HO Clarke Generating | Harris | 484 | 335,520 |
| Braes Bayou Plant | Fort Bend | 484 | 190,064 |
Source: EIA Forms EIA-860 and EIA-923, 2025.