Skip to main content
RateWatt

Biomass power plant, Vermont

J C McNeil biomass power plant, Vermont

J C McNeil is a 59.5 MW biomass power plant in Chittenden County, Vermont, operated by City of Burlington Electric-(VT), and it generated 209,276 MWh in 2025 (Forms EIA-860 and EIA-923). That is 10.3% of the generation reported in Vermont, and its capacity factor sits at the 46th percentile of U.S. biomass plants. By 2025 generation it ranks 2,424th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

59.5 MWNameplate capacity
46%Capacity factor, 2025, 46th percentile, on 52 MW net summer
10.3%Of VT generation, 2025
41 yearsAverage generator age, by MW

How hard does the J C McNeil plant run compared with other biomass plants?

The J C McNeil plant had a capacity factor of 46% in 2025 on 52 MW of net summer capacity, the 46th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 167 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
J C McNeil46%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the J C McNeil plant generating more or less than last year?

J C McNeil generated 209,276 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 13.3% behind the same months of 2025. 2024 has output for only 10 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024197,034
2025209,276
2026 through August135,859
2025, same months156,718
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202629,220
July 202611,969
June 202610,464
May 20260
April 202610,516
March 202628,803
February 202622,779
January 202622,108
December 202521,341
November 20258,530
October 20250
September 202522,687
August 202529,433
July 202526,010
June 202518,513
May 202513,684
April 2025552
March 202510,132
February 202525,714
January 202532,680
December 202431,662
November 202417,096
October 20240
September 202428,057
August 202417,644
July 202410,031
June 202412,434
May 20240
April 202416,986
March 202410,442
February 202422,834
January 202429,848

Source: EIA Form EIA-923, through August 2026.

How much of Vermont's electricity comes from the J C McNeil plant?

J C McNeil made 10.3% of the 2,033,030 MWh reported by Vermont plants in 2025, from 6.6% of the state's 899 MW of capacity. Its share of output is 1.6 times its share of capacity. By capacity it is the 2nd largest of 117 plants in Vermont, the 3,558th largest of 14,327 in the U.S. and the 67th largest of 585 biomass plants. By 2025 generation it is the largest of 114 generating plants in the state.

J C McNeil within Vermont, 2025
MeasureThis plantVermontShare
Capacity (MW)608996.6%
Generation (MWh)209,2762,033,03010.3%
Biomass capacity (MW)609065.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the J C McNeil plant, and when do they retire?

1 operable generator totals 59.5 MW, with an average age of 41 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s160100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingWood/Wood Waste Biomass601984n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the J C McNeil plant?

3 owners report shares in J C McNeil; City of Burlington Electric-(VT) holds the largest named share, 50.0% or about 29.8 MW. City of Burlington Electric-(VT) operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
City of Burlington Electric-(VT)50.0%30104,638
Green Mountain Power Corp31.0%1864,876
Vermont Public Power Supply Authority19.0%1139,762

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

What does City of Burlington Electric charge homes?

City of Burlington Electric, the operator of J C McNeil, had an average residential price of 19.80¢ per kWh and an average bill of $85 a month in 2025, 13% below the Vermont average of 22.79¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Vermont
City of Burlington Electric19.80¢$8513% lower
Vermont average22.79¢$135
U.S. average17.23¢$15124% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the J C McNeil plant?

J C McNeil is in Burlington, Chittenden County, Vermont, at 44.4917° N, 73.2081° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.