Battery and pumped storage power plant, California
J S Eastwood storage power plant, California
J S Eastwood is a 200 MW battery and pumped storage power plant in Fresno County, California, operated by Southern California Edison Co, and it generated 87,019 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 22nd percentile of U.S. battery and pumped storage plants. By 2025 generation it ranks 3,558th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the J S Eastwood plant run compared with other battery and pumped storage plants?
The J S Eastwood plant had a capacity factor of 5% in 2025 on 200 MW of net summer capacity, the 22nd percentile of the 9 U.S. battery and pumped storage plants with at least 20 MW. The typical battery and pumped storage plant reached 6%. That equals about 18 days at full output out of 365.
0%Shaded: the middle half of battery and pumped storage plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| J S Eastwood | 5% |
| Battery and pumped storage plants, 75th percentile | 14% |
| Battery and pumped storage plants, median | 6% |
| Battery and pumped storage plants, 25th percentile | 5% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the J S Eastwood plant generating more or less than last year?
J S Eastwood generated 87,019 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 5.7% ahead of the same months of 2025. 2024 has output for only 3 months, so the two years are not compared.
19 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.
| Period | MWh |
|---|---|
| 2024 | 17,030 |
| 2025 | 87,019 |
| 2026 through August | 66,581 |
| 2025, same months | 62,991 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | -132 |
| July 2026 | -137 |
| June 2026 | 16,358 |
| May 2026 | 50,951 |
| April 2026 | -8 |
| March 2026 | -183 |
| February 2026 | -130 |
| January 2026 | -138 |
| December 2025 | -90 |
| November 2025 | -115 |
| October 2025 | -1,456 |
| September 2025 | 25,689 |
| August 2025 | 9,439 |
| July 2025 | 8,300 |
| June 2025 | 38,322 |
| May 2025 | 22,656 |
| April 2025 | -6,024 |
| March 2025 | -872 |
| February 2025 | -5,521 |
| January 2025 | -3,309 |
| December 2024 | -4,787 |
| November 2024 | -98 |
| October 2024 | -142 |
| September 2024 | 18,226 |
| August 2024 | -1,887 |
| July 2024 | 5,094 |
| June 2024 | 705 |
| May 2024 | -80 |
| April 2024 | -1 |
| March 2024 | 0 |
| February 2024 | 0 |
| January 2024 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the J S Eastwood plant, and when do they retire?
1 operable generator totals 200 MW, with an average age of 38 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1980s | 1 | 200 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Hydroelectric Pumped Storage | 200 | 1987 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the J S Eastwood plant?
EIA lists no joint owners for J S Eastwood. Southern California Edison Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Southern California Edison Co charge homes?
Southern California Edison Co, the operator of J S Eastwood, had an average residential price of 31.48¢ per kWh and an average bill of $149 a month in 2025, about the same as the California average of 31.35¢.
| Measure | Price | Monthly bill | Against California |
|---|---|---|---|
| Southern California Edison Co | 31.48¢ | $149 | about the same |
| California average | 31.35¢ | $155 | |
| U.S. average | 17.23¢ | $151 | 45% lower |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the J S Eastwood plant?
J S Eastwood is in Shaver Lake, Fresno County, California, at 37.1479° N, 119.2567° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which battery and pumped storage plants in California are similar in size?
California has 132 operable battery and pumped storage plants with 11,629 MW of capacity, and J S Eastwood's 200 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Cathode (Hinson) BESS | Los Angeles | 200 | -38,320 |
| Condor Energy Storage LLC | San Bernardino | 200 | -28,855 |
| Peregrine Energy Storage LLC | San Diego | 200 | -10,752 |
| J S Eastwood | Fresno | 200 | 87,019 |
| Elkhorn Battery Energy Storage System | Monterey | 183 | -2,226 |
| Sanborn BESS 3 | Kern | 169 | -32,930 |
| Vikings Energy Farm | Imperial | 150 | -21,119 |
Source: EIA Forms EIA-860 and EIA-923, 2025.