Natural gas power plant, Texas
Jack Fusco Energy Center, Texas
Jack Fusco Energy Center is a 676 MW natural gas power plant in Fort Bend County, Texas, operated by Brazos Valley Energy, and it generated 3,645,651 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Texas, and its capacity factor sits at the 84th percentile of U.S. natural gas plants. By 2025 generation it ranks 322nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Jack Fusco Energy Center plant run compared with other natural gas plants?
The Jack Fusco Energy Center plant had a capacity factor of 69% in 2025 on 602 MW of net summer capacity, the 84th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 252 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Jack Fusco Energy Center | 69% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Jack Fusco Energy Center plant generating more or less than last year?
Generation at Jack Fusco Energy Center rose 7.3% from 2024 to 2025, from 3,398,399 MWh to 3,645,651 MWh. Through August 2026 it is running 11.8% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 3,398,399 |
| 2025 | 3,645,651 |
| 2026 through August | 2,646,723 |
| 2025, same months | 2,367,823 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 414,489 |
| July 2026 | 405,253 |
| June 2026 | 353,959 |
| May 2026 | 324,538 |
| April 2026 | 272,817 |
| March 2026 | 183,840 |
| February 2026 | 309,626 |
| January 2026 | 382,201 |
| December 2025 | 306,880 |
| November 2025 | 275,424 |
| October 2025 | 309,074 |
| September 2025 | 386,450 |
| August 2025 | 400,700 |
| July 2025 | 374,054 |
| June 2025 | 382,815 |
| May 2025 | 340,067 |
| April 2025 | 297,243 |
| March 2025 | 75,394 |
| February 2025 | 203,847 |
| January 2025 | 293,703 |
| December 2024 | 126,467 |
| November 2024 | 159,963 |
| October 2024 | 353,116 |
| September 2024 | 325,038 |
| August 2024 | 418,408 |
| July 2024 | 412,603 |
| June 2024 | 381,085 |
| May 2024 | 388,064 |
| April 2024 | 298,903 |
| March 2024 | 10,942 |
| February 2024 | 209,764 |
| January 2024 | 314,046 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Jack Fusco Energy Center plant, and when do they retire?
3 operable generators total 676 MW, with an average age of 22 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 3 | 676 | 100% | none reported |
Every generator, 5 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CTG1 | Operating | Natural Gas Fired Combined Cycle | 200 | 2003 | n/a |
| CTG2 | Operating | Natural Gas Fired Combined Cycle | 200 | 2003 | n/a |
| STG1 | Operating | Natural Gas Fired Combined Cycle | 276 | 2003 | n/a |
| CTG3 | Postponed indefinitely | Natural Gas Fired Combined Cycle | 200 | n/a | n/a |
| CTG4 | Postponed indefinitely | Natural Gas Fired Combined Cycle | 200 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Jack Fusco Energy Center plant?
EIA lists no joint owners for Jack Fusco Energy Center. Brazos Valley Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Jack Fusco Energy Center plant?
Jack Fusco Energy Center is in Thompsons, Fort Bend County, Texas, at 29.4731° N, 95.6244° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Texas are similar in size?
Texas has 305 operable natural gas plants with 81,574 MW of capacity, and Jack Fusco Energy Center's 676 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Nueces Bay | Nueces | 730 | 1,821,343 |
| Stryker Creek | Cherokee | 703 | 1,343,906 |
| Sand Hill | Travis | 696 | 1,960,692 |
| Jack Fusco Energy Center | Fort Bend | 676 | 3,645,651 |
| ExxonMobil Beaumont Refinery | Jefferson | 670 | 4,273,151 |
| Colorado Bend Energy Center | Wharton | 654 | 2,224,187 |
| Odyssey Energy Altura Cogen, LLC | Harris | 644 | 3,444,109 |
Source: EIA Forms EIA-860 and EIA-923, 2025.