Coal power plant, Missouri
John Twitty Energy Center, Missouri
John Twitty Energy Center is a 603 MW power plant, 494 MW of it coal, in Greene County, Missouri, operated by City Utilities of Springfield-(MO), and it generated 2,064,209 MWh in 2025 (Forms EIA-860 and EIA-923). That is 2.9% of the generation reported in Missouri, and its capacity factor sits at the 50th percentile of U.S. coal plants. By 2025 generation it ranks 495th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the John Twitty Energy Center plant run compared with other coal plants?
The John Twitty Energy Center plant's coal units had a capacity factor of 50% in 2025 on 459 MW of net summer capacity, the 50th percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 181 days at full output out of 365.
0%Shaded: the middle half of coal plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| John Twitty Energy Center | 50% |
| Coal plants, 75th percentile | 63% |
| Coal plants, median | 49% |
| Coal plants, 25th percentile | 37% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its coal generators only. Values above 105% are left out of the comparison.
Is the John Twitty Energy Center plant generating more or less than last year?
Generation at John Twitty Energy Center fell 9.8% from 2024 to 2025, from 2,289,636 MWh to 2,064,209 MWh. Through August 2026 it is running 10.7% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 2,289,636 |
| 2025 | 2,064,209 |
| 2026 through August | 1,263,934 |
| 2025, same months | 1,414,854 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 237,565 |
| July 2026 | 230,258 |
| June 2026 | 176,036 |
| May 2026 | 118,677 |
| April 2026 | 72,810 |
| March 2026 | 122,119 |
| February 2026 | 141,564 |
| January 2026 | 164,905 |
| December 2025 | 164,094 |
| November 2025 | 148,139 |
| October 2025 | 157,759 |
| September 2025 | 179,363 |
| August 2025 | 222,693 |
| July 2025 | 130,604 |
| June 2025 | 216,026 |
| May 2025 | 165,100 |
| April 2025 | 98,134 |
| March 2025 | 111,118 |
| February 2025 | 195,029 |
| January 2025 | 276,150 |
| December 2024 | 198,934 |
| November 2024 | 161,640 |
| October 2024 | 133,157 |
| September 2024 | 204,290 |
| August 2024 | 236,065 |
| July 2024 | 260,408 |
| June 2024 | 219,735 |
| May 2024 | 178,084 |
| April 2024 | 153,083 |
| March 2024 | 255,647 |
| February 2024 | 166,431 |
| January 2024 | 122,162 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the John Twitty Energy Center plant, and when do they retire?
4 operable generators total 603 MW, with an average age of 30 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1970s | 1 | 194 | 32% | none reported |
| 1980s | 2 | 109 | 18% | none reported |
| 2010s | 1 | 300 | 50% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ST1 | Operating | Conventional Steam Coal | 194 | 1976 | n/a |
| GT1 | Operating | Natural Gas Fired Combustion Turbine | 57 | 1983 | n/a |
| GT2 | Operating | Natural Gas Fired Combustion Turbine | 52 | 1983 | n/a |
| ST2 | Operating | Conventional Steam Coal | 300 | 2011 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the John Twitty Energy Center plant?
EIA lists no joint owners for John Twitty Energy Center. City Utilities of Springfield-(MO) operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does City Utilities of Springfield charge homes?
City Utilities of Springfield, the operator of John Twitty Energy Center, had an average residential price of 11.65¢ per kWh and an average bill of $101 a month in 2025, 12% below the Missouri average of 13.30¢.
| Measure | Price | Monthly bill | Against Missouri |
|---|---|---|---|
| City Utilities of Springfield | 11.65¢ | $101 | 12% lower |
| Missouri average | 13.30¢ | $138 | |
| U.S. average | 17.23¢ | $151 | 30% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
What fuels does the John Twitty Energy Center plant use?
John Twitty Energy Center has capacity on 2 fuels: 82% coal and 18% natural gas. In 2025, coal made 97% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Coal | 494 | 81.9% | 1,995,596 |
| Natural gas | 109 | 18.1% | 68,613 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the John Twitty Energy Center plant?
John Twitty Energy Center is in Springfield, Greene County, Missouri, at 37.1517° N, 93.3880° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which coal plants in Missouri are similar in size?
Missouri has 8 operable coal plants with 9,048 MW of capacity, and John Twitty Energy Center's 494 MW is 5% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Hawthorn | Jackson | 569 | 2,432,048 |
| John Twitty Energy Center | Greene | 494 | 1,995,596 |
| Sikeston Power Station | Scott | 261 | 1,467,565 |
Source: EIA Forms EIA-860 and EIA-923, 2025.