Wind power plant, Washington
Juniper Canyon I Wind Project, Washington
Juniper Canyon I Wind Project is a 151 MW wind power plant in Klickitat County, Washington, operated by Avangrid Power LLC, and it generated 144,179 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Washington, and its capacity factor sits at the 3rd percentile of U.S. wind plants. By 2025 generation it ranks 2,965th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Juniper Canyon I Wind Project plant run compared with other wind plants?
The Juniper Canyon I Wind Project plant had a capacity factor of 11% in 2025 on 149 MW of net summer capacity, the 3rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 40 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Juniper Canyon I Wind Project | 11% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Juniper Canyon I Wind Project plant generating more or less than last year?
Generation at Juniper Canyon I Wind Project fell 46.7% from 2024 to 2025, from 270,525 MWh to 144,179 MWh. Through August 2026 it is running 0.1% behind the same months of 2025.
5 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.
| Period | MWh |
|---|---|
| 2024 | 270,525 |
| 2025 | 144,179 |
| 2026 through August | 144,298 |
| 2025, same months | 144,424 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 19,855 |
| July 2026 | 24,082 |
| June 2026 | 26,719 |
| May 2026 | 28,431 |
| April 2026 | 25,314 |
| March 2026 | 17,686 |
| February 2026 | 2,275 |
| January 2026 | -64 |
| December 2025 | -84 |
| November 2025 | -60 |
| October 2025 | -59 |
| September 2025 | -42 |
| August 2025 | 2,734 |
| July 2025 | 12,085 |
| June 2025 | 26,006 |
| May 2025 | 28,487 |
| April 2025 | 21,041 |
| March 2025 | 28,753 |
| February 2025 | 14,215 |
| January 2025 | 11,103 |
| December 2024 | 18,469 |
| November 2024 | 22,069 |
| October 2024 | 27,296 |
| September 2024 | 15,894 |
| August 2024 | 9,225 |
| July 2024 | 9,428 |
| June 2024 | 29,719 |
| May 2024 | 32,660 |
| April 2024 | 37,946 |
| March 2024 | 26,190 |
| February 2024 | 22,757 |
| January 2024 | 18,872 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Juniper Canyon I Wind Project plant, and when do they retire?
1 operable generator totals 151 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 151 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 151 | 2011 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Juniper Canyon I Wind Project plant?
EIA lists no joint owners for Juniper Canyon I Wind Project. Avangrid Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Juniper Canyon I Wind Project plant?
Juniper Canyon I Wind Project is in Bickleton, Klickitat County, Washington, at 45.9215° N, 120.2355° W. It sits in the Avangrid Renewables LLC balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Washington are similar in size?
Washington has 23 operable wind plants with 3,387 MW of capacity, and Juniper Canyon I Wind Project's 151 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Big Horn Wind Project | Klickitat | 199 | 475,549 |
| FPL Energy Vansycle LLC (WA) | Walla Walla | 177 | 249,731 |
| Hopkins Ridge Wind | Columbia | 157 | 345,386 |
| Juniper Canyon I Wind Project | Klickitat | 151 | 144,179 |
| Rattlesnake Flat | Adams | 144 | 414,699 |
| Washington Wind | Klickitat | 136 | 378,988 |
| Skookumchuck Wind Facility | Thurston | 136 | 392,843 |
Source: EIA Forms EIA-860 and EIA-923, 2025.