Skip to main content
RateWatt

Wind power plant, Washington

Juniper Canyon I Wind Project, Washington

Juniper Canyon I Wind Project is a 151 MW wind power plant in Klickitat County, Washington, operated by Avangrid Power LLC, and it generated 144,179 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Washington, and its capacity factor sits at the 3rd percentile of U.S. wind plants. By 2025 generation it ranks 2,965th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

151 MWNameplate capacity
11%Capacity factor, 2025, 3rd percentile, on 149 MW net summer
0.1%Of WA generation, 2025
14 yearsAverage generator age, by MW

How hard does the Juniper Canyon I Wind Project plant run compared with other wind plants?

The Juniper Canyon I Wind Project plant had a capacity factor of 11% in 2025 on 149 MW of net summer capacity, the 3rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 40 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Juniper Canyon I Wind Project11%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Juniper Canyon I Wind Project plant generating more or less than last year?

Generation at Juniper Canyon I Wind Project fell 46.7% from 2024 to 2025, from 270,525 MWh to 144,179 MWh. Through August 2026 it is running 0.1% behind the same months of 2025.

5 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
2024270,525
2025144,179
2026 through August144,298
2025, same months144,424
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202619,855
July 202624,082
June 202626,719
May 202628,431
April 202625,314
March 202617,686
February 20262,275
January 2026-64
December 2025-84
November 2025-60
October 2025-59
September 2025-42
August 20252,734
July 202512,085
June 202526,006
May 202528,487
April 202521,041
March 202528,753
February 202514,215
January 202511,103
December 202418,469
November 202422,069
October 202427,296
September 202415,894
August 20249,225
July 20249,428
June 202429,719
May 202432,660
April 202437,946
March 202426,190
February 202422,757
January 202418,872

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Juniper Canyon I Wind Project plant?

Juniper Canyon I Wind Project made 0.1% of the 101,512,862 MWh reported by Washington plants in 2025, from 0.5% of the state's 31,712 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 41st largest of 139 plants in Washington, the 1,958th largest of 14,327 in the U.S. and the 435th largest of 1,358 wind plants. By 2025 generation it is the 69th largest of 129 generating plants in the state.

Juniper Canyon I Wind Project within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)15131,7120.5%
Generation (MWh)144,179101,512,8620.1%
Wind capacity (MW)1513,3874.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Juniper Canyon I Wind Project plant, and when do they retire?

1 operable generator totals 151 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1151100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine1512011n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Juniper Canyon I Wind Project plant?

EIA lists no joint owners for Juniper Canyon I Wind Project. Avangrid Power LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Juniper Canyon I Wind Project plant?

Juniper Canyon I Wind Project is in Bickleton, Klickitat County, Washington, at 45.9215° N, 120.2355° W. It sits in the Avangrid Renewables LLC balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Washington are similar in size?

Washington has 23 operable wind plants with 3,387 MW of capacity, and Juniper Canyon I Wind Project's 151 MW is 4% of that.

Wind plants in Washington around this size
PlantCountyMW2025 MWh
Big Horn Wind ProjectKlickitat199475,549
FPL Energy Vansycle LLC (WA)Walla Walla177249,731
Hopkins Ridge WindColumbia157345,386
Juniper Canyon I Wind ProjectKlickitat151144,179
Rattlesnake FlatAdams144414,699
Washington WindKlickitat136378,988
Skookumchuck Wind FacilityThurston136392,843

Source: EIA Forms EIA-860 and EIA-923, 2025.