Solar power plant, Florida

Juniper Solar power plant, Florida

Juniper Solar (FL) is a 70 MW solar power plant in Pasco County, Florida, operated by Tampa Electric Co, and it generated 147,764 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 57th percentile of U.S. solar plants. By 2025 generation it ranks 2,923rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

70 MWNameplate capacity
24%Capacity factor, 2025, 57th percentile, on 70 MW net summer
0.1%Of FL generation, 2025
2 yearsAverage generator age, by MW

How hard does the Juniper Solar (FL) plant run compared with other solar plants?

The Juniper Solar (FL) plant had a capacity factor of 24% in 2025 on 70 MW of net summer capacity, the 57th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 88 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Juniper Solar (FL)24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Juniper Solar (FL) plant generating more or less than last year?

Generation at Juniper Solar (FL) rose 0.6% from 2024 to 2025, from 146,883 MWh to 147,764 MWh. Through August 2026 it is running 4.1% behind the same months of 2025.

Net generation by period
PeriodMWh
2024146,883
2025147,764
2026 through August101,846
2025, same months106,156
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,769
July 202613,121
June 202614,488
May 202613,795
April 202614,950
March 202613,171
February 202611,088
January 20268,464
December 20257,955
November 202510,656
October 202511,412
September 202511,585
August 202512,737
July 202514,297
June 202513,817
May 202515,481
April 202517,600
March 202514,262
February 20259,355
January 20258,607
December 20248,209
November 20248,584
October 20247,993
September 202411,026
August 202411,837
July 202414,665
June 202416,177
May 202418,801
April 202417,682
March 202413,260
February 202410,871
January 20247,778

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Juniper Solar (FL) plant?

Juniper Solar (FL) made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 220th largest of 331 plants in Florida, the 3,346th largest of 14,327 in the U.S. and the 776th largest of 7,223 solar plants. By 2025 generation it is the 161st largest of 313 generating plants in the state.

Juniper Solar (FL) within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7079,9360.1%
Generation (MWh)147,764267,867,7350.1%
Solar capacity (MW)7012,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Juniper Solar (FL) plant, and when do they retire?

1 operable generator totals 70 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s170100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic702023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Juniper Solar (FL) plant?

EIA lists no joint owners for Juniper Solar (FL). Tampa Electric Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Tampa Electric Co charge homes?

Tampa Electric Co, the operator of Juniper Solar (FL), had an average residential price of 17.32¢ per kWh and an average bill of $194 a month in 2025, 14% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Tampa Electric Co17.32¢$19414% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Juniper Solar (FL) plant?

Juniper Solar (FL) is in Zephyrhills, Pasco County, Florida, at 28.1816° N, 82.1553° W. It sits in the Tampa Electric Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Juniper Solar (FL)'s 70 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Cottonmouth Ranch SolarHillsborough755,205
Balm SolarHillsborough74139,924
Payne Creek SolarPolk70114,030
Juniper Solar (FL)Pasco70147,764
Laurel Oaks SolarHillsborough61123,887
Grange Hall SolarHillsborough61119,476
Alafia SolarPolk60117,711

Source: EIA Forms EIA-860 and EIA-923, 2025.