Skip to main content
RateWatt

Wind power plant, Texas

King Creek Wind Farm 1, LLC power plant, Texas

King Creek Wind Farm 1, LLC is a 184 MW wind power plant in Haskell County, Texas, operated by King Creek Wind Farm 1, LLC, and it generated 560,127 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 56th percentile of U.S. wind plants. By 2025 generation it ranks 1,211th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

184 MWNameplate capacity
35%Capacity factor, 2025, 56th percentile, on 184 MW net summer
0.1%Of TX generation, 2025
3 yearsAverage generator age, by MW

How hard does the King Creek Wind Farm 1, LLC plant run compared with other wind plants?

The King Creek Wind Farm 1, LLC plant had a capacity factor of 35% in 2025 on 184 MW of net summer capacity, the 56th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 127 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
King Creek Wind Farm 1, LLC35%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the King Creek Wind Farm 1, LLC plant generating more or less than last year?

Generation at King Creek Wind Farm 1, LLC rose 1.4% from 2024 to 2025, from 552,499 MWh to 560,127 MWh. Through August 2026 it is running 16.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024552,499
2025560,127
2026 through August435,892
2025, same months372,786
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202647,912
July 202642,610
June 202658,813
May 202651,277
April 202664,274
March 202673,212
February 202646,863
January 202650,931
December 202560,094
November 202547,720
October 202544,100
September 202535,427
August 202532,826
July 202539,676
June 202551,090
May 202541,791
April 202558,492
March 202558,104
February 202543,310
January 202547,497
December 202443,398
November 202450,148
October 202453,676
September 202426,443
August 202440,942
July 202440,193
June 202448,184
May 202447,536
April 202454,553
March 202454,131
February 202452,907
January 202440,388

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the King Creek Wind Farm 1, LLC plant?

King Creek Wind Farm 1, LLC made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. By capacity it is the 351st largest of 1,023 plants in Texas, the 1,725th largest of 14,327 in the U.S. and the 358th largest of 1,358 wind plants. By 2025 generation it is the 237th largest of 816 generating plants in the state.

King Creek Wind Farm 1, LLC within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)184195,9660.1%
Generation (MWh)560,127592,896,1760.1%
Wind capacity (MW)18443,9420.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the King Creek Wind Farm 1, LLC plant, and when do they retire?

1 operable generator totals 184 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1184100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
KC1OperatingOnshore Wind Turbine1842022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the King Creek Wind Farm 1, LLC plant?

EIA lists no joint owners for King Creek Wind Farm 1, LLC. King Creek Wind Farm 1, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the King Creek Wind Farm 1, LLC plant?

King Creek Wind Farm 1, LLC is in Throckmorton, Haskell County, Texas, at 33.2680° N, 99.4680° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and King Creek Wind Farm 1, LLC's 184 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
BearkatGlasscock197648,295
Spinning Spur Wind IIIOldham194718,566
Baffin WindKenedy188125,046
King Creek Wind Farm 1, LLCHaskell184560,127
Lockett WindfarmWilbarger184710,238
Brazos Wind FarmScurry182655,188
Maryneal WindpowerNolan182544,955

Source: EIA Forms EIA-860 and EIA-923, 2025.