Skip to main content
RateWatt

Natural gas power plant, Michigan

Lansing BWL REO Town Plant, Michigan

Lansing BWL REO Town Plant is a 98 MW natural gas power plant in Ingham County, Michigan, operated by Lansing Board of Water and Light, and it generated 477,248 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Michigan, and its capacity factor sits at the 88th percentile of U.S. natural gas plants. By 2025 generation it ranks 1,388th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

98 MWNameplate capacity
73%Capacity factor, 2025, 88th percentile, on 74.9 MW net summer
0.4%Of MI generation, 2025
12 yearsAverage generator age, by MW

How hard does Lansing BWL REO Town Plant run compared with other natural gas plants?

Lansing BWL REO Town Plant had a capacity factor of 73% in 2025 on 74.9 MW of net summer capacity, the 88th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 265 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Lansing BWL REO Town Plant73%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Lansing BWL REO Town Plant generating more or less than last year?

Generation at Lansing BWL REO Town Plant rose 9.3% from 2024 to 2025, from 436,530 MWh to 477,248 MWh.

Net generation by period
PeriodMWh
2024436,530
2025477,248
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202536,529
November 202557,628
October 202525,228
September 202516,504
August 202541,541
July 202548,329
June 202537,386
May 202543,682
April 202524,415
March 202547,253
February 202548,786
January 202549,967
December 202466,785
November 202466,662
October 202412,242
September 202445,044
August 202445,617
July 202439,704
June 202426,147
May 202410,652
April 202428,668
March 202428,860
February 202431,934
January 202434,215

Source: EIA Form EIA-923, through August 2026.

How much of Michigan's electricity comes from Lansing BWL REO Town Plant?

Lansing BWL REO Town Plant made 0.4% of the 127,929,498 MWh reported by Michigan plants in 2025, from 0.3% of the state's 34,725 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 60th largest of 283 plants in Michigan, the 2,771st largest of 14,327 in the U.S. and the 912th largest of 1,962 natural gas plants. By 2025 generation it is the 24th largest of 261 generating plants in the state.

Lansing BWL REO Town Plant within Michigan, 2025
MeasureThis plantMichiganShare
Capacity (MW)9834,7250.3%
Generation (MWh)477,248127,929,4980.4%
Natural gas capacity (MW)9814,3970.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Lansing BWL REO Town Plant, and when do they retire?

3 operable generators total 98 MW, with an average age of 12 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s398100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CTG1OperatingNatural Gas Fired Combined Cycle422013n/a
CTG2OperatingNatural Gas Fired Combined Cycle422013n/a
STOperatingNatural Gas Fired Combined Cycle142013n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Lansing BWL REO Town Plant?

EIA lists no joint owners for Lansing BWL REO Town Plant. Lansing Board of Water and Light operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is Lansing BWL REO Town Plant?

Lansing BWL REO Town Plant is in Lansing, Ingham County, Michigan, at 42.7197° N, 84.5517° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Michigan are similar in size?

Michigan has 60 operable natural gas plants with 14,397 MW of capacity, and Lansing BWL REO Town Plant's 98 MW is 1% of that.

Natural gas plants in Michigan around this size
PlantCountyMW2025 MWh
F.D. Kuester Generating StationMarquette132368,170
T B Simon Power PlantIngham128250,612
HancockOakland12220,385
Lansing BWL REO Town PlantIngham98477,248
Kalamazoo River Generating StationKalamazoo77136,326
Northeast (MI)Macomb7112,844
Gaylord - WolverineOtsego7037,086

Source: EIA Forms EIA-860 and EIA-923, 2025.