Leland Olds coal power plant, North Dakota

Leland Olds is a 656 MW coal power plant in Mercer County, North Dakota, operated by Basin Electric Power Coop, and it generated 2,354,003 MWh in 2025 (Forms EIA-860 and EIA-923). That is 5.5% of the generation reported in North Dakota, and its capacity factor sits at the 31st percentile of U.S. coal plants. By 2025 generation it ranks 456th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

656 MWNameplate capacity
41%Capacity factor, 2025, 31st percentile, on 660 MW net summer
5.5%Of ND generation, 2025
53 yearsAverage generator age, by MW

How hard does the Leland Olds plant run compared with other coal plants?

The Leland Olds plant had a capacity factor of 41% in 2025 on 660 MW of net summer capacity, the 31st percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 148 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Leland Olds41%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Leland Olds plant generating more or less than last year?

Generation at Leland Olds fell 23.1% from 2024 to 2025, from 3,061,093 MWh to 2,354,003 MWh. Through August 2026 it is running 97.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20243,061,093
20252,354,003
2026 through August2,652,324
2025, same months1,343,795
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026402,051
July 2026394,512
June 2026347,945
May 2026266,513
April 2026263,377
March 2026307,503
February 2026315,479
January 2026354,944
December 2025265,672
November 2025247,825
October 2025271,758
September 2025224,953
August 2025129,917
July 2025135,123
June 2025107,215
May 2025102,448
April 202599,100
March 2025152,072
February 2025317,896
January 2025300,024
December 2024338,202
November 2024276,609
October 2024104,788
September 2024166,818
August 2024309,691
July 2024320,152
June 2024243,174
May 2024297,254
April 2024198,389
March 2024188,320
February 2024299,599
January 2024318,097

Source: EIA Form EIA-923, through August 2026.

How much of North Dakota's electricity comes from the Leland Olds plant?

Leland Olds made 5.5% of the 42,873,330 MWh reported by North Dakota plants in 2025, from 6.0% of the state's 10,973 MW of capacity. By capacity it is the 5th largest of 62 plants in North Dakota, the 540th largest of 14,327 in the U.S. and the 99th largest of 195 coal plants. By 2025 generation it is the 4th largest of 57 generating plants in the state.

Leland Olds within North Dakota, 2025
MeasureThis plantNorth DakotaShare
Capacity (MW)65610,9736.0%
Generation (MWh)2,354,00342,873,3305.5%
Coal capacity (MW)6564,02316.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Leland Olds plant, and when do they retire?

2 operable generators total 656 MW, with an average age of 53 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s121633%none reported
1970s144067%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Steam Coal2161966n/a
2OperatingConventional Steam Coal4401975n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Leland Olds plant?

EIA lists no joint owners for Leland Olds. Basin Electric Power Coop operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Leland Olds plant?

Leland Olds is in Stanton, Mercer County, North Dakota, at 47.2808° N, 101.3212° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which coal plants in North Dakota are similar in size?

North Dakota has 7 operable coal plants with 4,023 MW of capacity, and Leland Olds' 656 MW is 16% of that.

Coal plants in North Dakota around this size
PlantCountyMW2025 MWh
Coal CreekMcLean1,2108,231,793
Antelope ValleyMercer9545,961,393
Milton R YoungOliver7343,717,829
Leland OldsMercer6562,342,658
CoyoteMercer4502,124,695

Source: EIA Forms EIA-860 and EIA-923, 2025.