Little Manatee River Solar power plant, Florida

Little Manatee River Solar is a 74.5 MW solar power plant in Hillsborough County, Florida, operated by Tampa Electric Co, and it generated 88,718 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 10th percentile of U.S. solar plants. By 2025 generation it ranks 3,530th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
14%Capacity factor, 2025, 10th percentile, on 74.5 MW net summer
3,530thU.S. rank by generation, 2025
5 yearsAverage generator age, by MW

How hard does the Little Manatee River Solar plant run compared with other solar plants?

The Little Manatee River Solar plant had a capacity factor of 14% in 2025 on 74.5 MW of net summer capacity, the 10th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 50 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Little Manatee River Solar14%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Little Manatee River Solar plant generating more or less than last year?

Generation at Little Manatee River Solar fell 30.4% from 2024 to 2025, from 127,380 MWh to 88,718 MWh. Through August 2026 it is running 65.6% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024127,380
202588,718
2026 through August101,568
2025, same months61,347
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,345
July 202612,463
June 202614,203
May 202615,070
April 202614,015
March 202613,709
February 202610,626
January 20269,137
December 20258,732
November 20258,233
October 20255,826
September 20254,580
August 20255,337
July 20254,892
June 20255,105
May 202510,769
April 202511,812
March 20259,816
February 20257,429
January 20256,187
December 20246,585
November 20247,065
October 20243,544
September 202410,304
August 202411,859
July 202412,197
June 202413,770
May 202416,343
April 202415,641
March 202412,471
February 202410,773
January 20246,828

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Little Manatee River Solar plant?

Little Manatee River Solar made 0.0% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 652nd largest of 7,223 solar plants. By 2025 generation it is the 226th largest of 313 generating plants in the state.

Little Manatee River Solar within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)88,718267,867,7350.0%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Little Manatee River Solar plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingSolar Photovoltaic752020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Little Manatee River Solar plant?

EIA lists no joint owners for Little Manatee River Solar. Tampa Electric Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Tampa Electric Co charge homes?

Tampa Electric Co, the operator of Little Manatee River Solar, had an average residential price of 17.32¢ per kWh and an average bill of $194 a month in 2025, 14% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Tampa Electric Co17.32¢$19414% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Little Manatee River Solar plant?

Little Manatee River Solar is in Ruskin, Hillsborough County, Florida, at 27.6913° N, 82.4106° W. It sits in the Tampa Electric Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Little Manatee River Solar's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Twin LakesPutnam75122,507
Babcock PreserveCharlotte75151,839
Northern Preserve SolarBaker75119,146
Little Manatee River SolarHillsborough7588,718
Nassau Solar CenterNassau75134,458
Magnolia Springs Solar CenterClay75120,759
Trailside Solar CenterSt Johns75135,550