Wind power plant, Pennsylvania
Locust Ridge wind power plant, Pennsylvania
Locust Ridge is a 26 MW wind power plant in Schuylkill County, Pennsylvania, operated by Avangrid Power LLC, and it generated 55,936 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 20th percentile of U.S. wind plants. By 2025 generation it ranks 3,951st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Locust Ridge plant run compared with other wind plants?
The Locust Ridge plant had a capacity factor of 25% in 2025 on 26 MW of net summer capacity, the 20th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 90 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Locust Ridge | 25% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Locust Ridge plant generating more or less than last year?
Generation at Locust Ridge rose 11.1% from 2024 to 2025, from 50,370 MWh to 55,936 MWh.
| Period | MWh |
|---|---|
| 2024 | 50,370 |
| 2025 | 55,936 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 5,048 |
| November 2025 | 5,065 |
| October 2025 | 4,016 |
| September 2025 | 1,759 |
| August 2025 | 1,993 |
| July 2025 | 1,482 |
| June 2025 | 2,825 |
| May 2025 | 4,845 |
| April 2025 | 6,630 |
| March 2025 | 7,912 |
| February 2025 | 6,427 |
| January 2025 | 7,934 |
| December 2024 | 6,052 |
| November 2024 | 5,391 |
| October 2024 | 3,258 |
| September 2024 | 3,114 |
| August 2024 | 2,597 |
| July 2024 | 1,903 |
| June 2024 | 2,883 |
| May 2024 | 2,908 |
| April 2024 | 5,010 |
| March 2024 | 6,485 |
| February 2024 | 5,002 |
| January 2024 | 5,767 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Locust Ridge plant, and when do they retire?
1 operable generator totals 26 MW, with an average age of 18 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 26 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| LRWF | Operating | Onshore Wind Turbine | 26 | 2007 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Locust Ridge plant?
EIA lists no joint owners for Locust Ridge. Avangrid Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Locust Ridge plant?
Locust Ridge is in Mahanoy City, Schuylkill County, Pennsylvania, at 40.8550° N, 76.1292° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Pennsylvania are similar in size?
Pennsylvania has 27 operable wind plants with 1,556 MW of capacity, and Locust Ridge's 26 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Meyersdale Windpower, LLC | Somerset | 30 | 32,767 |
| Patton Wind Farm | Cambria | 30 | 95,781 |
| Forward Windpower LLC | Somerset | 29 | 54,753 |
| Locust Ridge | Schuylkill | 26 | 55,936 |
| Wind Park Bear Creek | Luzerne | 24 | 68,867 |
| Mill Run Windpower LLC | Somerset | 15 | 18,876 |
Source: EIA Forms EIA-860 and EIA-923, 2025.