Skip to main content
RateWatt

Wind power plant, Texas

Logans Gap Wind LLC power plant, Texas

Logans Gap Wind LLC is a 200 MW wind power plant in Comanche County, Texas, operated by Pattern Operators LP, and it generated 604,021 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 55th percentile of U.S. wind plants. By 2025 generation it ranks 1,122nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
34%Capacity factor, 2025, 55th percentile, on 200 MW net summer
0.1%Of TX generation, 2025
10 yearsAverage generator age, by MW

How hard does the Logans Gap Wind LLC plant run compared with other wind plants?

The Logans Gap Wind LLC plant had a capacity factor of 34% in 2025 on 200 MW of net summer capacity, the 55th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 126 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Logans Gap Wind LLC34%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Logans Gap Wind LLC plant generating more or less than last year?

Generation at Logans Gap Wind LLC rose 2.5% from 2024 to 2025, from 589,082 MWh to 604,021 MWh. Through August 2026 it is running 5.5% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024589,082
2025604,021
2026 through August422,042
2025, same months399,974
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202651,549
July 202646,479
June 202650,019
May 202641,681
April 202658,642
March 202670,689
February 202650,387
January 202652,596
December 202568,615
November 202557,666
October 202543,672
September 202534,094
August 202530,987
July 202548,360
June 202541,820
May 202551,737
April 202564,202
March 202565,540
February 202548,640
January 202548,688
December 202449,998
November 202457,834
October 202437,316
September 202426,492
August 202440,128
July 202439,960
June 202448,174
May 202452,365
April 202463,523
March 202455,658
February 202467,830
January 202449,804

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Logans Gap Wind LLC plant?

Logans Gap Wind LLC made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. By capacity it is the 300th largest of 1,023 plants in Texas, the 1,519th largest of 14,327 in the U.S. and the 271st largest of 1,358 wind plants. By 2025 generation it is the 216th largest of 816 generating plants in the state.

Logans Gap Wind LLC within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)200195,9660.1%
Generation (MWh)604,021592,896,1760.1%
Wind capacity (MW)20043,9420.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Logans Gap Wind LLC plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine2002015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Logans Gap Wind LLC plant?

Logans Gap Wind LLC is the only joint owner reported for Logans Gap Wind LLC, with 100.0%. Pattern Operators LP operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Logans Gap Wind LLC plant?

Logans Gap Wind LLC is in Comanche, Comanche County, Texas, at 31.8225° N, 98.6906° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Logans Gap Wind LLC's 200 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Raymond Wind Farm, LLCWillacy200676,290
El Algodon Alto Wind Farm, LLCSan Patricio200650,517
Papalote Creek II LLCSan Patricio200502,662
Logans Gap Wind LLCComanche200604,021
Mesquite Wind Power LLCShackelford200346,274
Post Oak Wind LLCShackelford200413,996
Los Vientos Wind 1ACameron200408,298

Source: EIA Forms EIA-860 and EIA-923, 2025.