Skip to main content
RateWatt

Hydro power plant, Washington

Long Lake hydroelectric power plant, Washington

Long Lake is a 70 MW hydro power plant in Lincoln County, Washington, operated by Avista Corp, and it generated 435,363 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Washington, and its capacity factor sits at the 93rd percentile of U.S. hydro plants. By 2025 generation it ranks 1,496th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

70 MWNameplate capacity
56%Capacity factor, 2025, 93rd percentile, on 89.5 MW net summer
0.4%Of WA generation, 2025
107 yearsAverage generator age, by MW

How hard does the Long Lake plant run compared with other hydro plants?

The Long Lake plant had a capacity factor of 56% in 2025 on 89.5 MW of net summer capacity, the 93rd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 203 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Long Lake56%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Long Lake plant generating more or less than last year?

Generation at Long Lake fell 4.6% from 2024 to 2025, from 456,166 MWh to 435,363 MWh.

Net generation by period
PeriodMWh
2024456,166
2025435,363
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202545,402
November 202529,626
October 202518,730
September 202512,613
August 20259,313
July 202513,947
June 202534,636
May 202562,706
April 202560,230
March 202559,250
February 202532,135
January 202556,775
December 202441,943
November 202433,000
October 202418,646
September 202412,828
August 202411,620
July 202417,812
June 202440,606
May 202456,551
April 202460,046
March 202461,874
February 202458,276
January 202442,964

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Long Lake plant?

Long Lake made 0.4% of the 101,512,862 MWh reported by Washington plants in 2025, from 0.2% of the state's 31,712 MW of capacity. Its share of output is 1.9 times its share of capacity. By capacity it is the 64th largest of 139 plants in Washington, the 3,346th largest of 14,327 in the U.S. and the 219th largest of 1,393 hydro plants. By 2025 generation it is the 38th largest of 129 generating plants in the state.

Long Lake within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)7031,7120.2%
Generation (MWh)435,363101,512,8620.4%
Hydro capacity (MW)7021,4620.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Long Lake plant, and when do they retire?

4 operable generators total 70 MW, with an average age of 107 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1910s35375%none reported
1920s11825%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric181915n/a
2OperatingConventional Hydroelectric181915n/a
3OperatingConventional Hydroelectric181919n/a
4OperatingConventional Hydroelectric181924n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Long Lake plant?

EIA lists no joint owners for Long Lake. Avista Corp operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Avista Corp charge homes?

Avista Corp, the operator of Long Lake, had an average residential price of 14.16¢ per kWh and an average bill of $130 a month in 2025, 7% above the Washington average of 13.17¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Washington
Avista Corp14.16¢$1307% higher
Washington average13.17¢$124
U.S. average17.23¢$15131% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Long Lake plant?

Long Lake is in Ford, Lincoln County, Washington, at 47.8344° N, 117.8361° W. It sits in the Avista Corporation balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Washington are similar in size?

Washington has 73 operable hydro plants with 21,462 MW of capacity, and Long Lake's 70 MW is 0% of that.

Hydro plants in Washington around this size
PlantCountyMW2025 MWh
Box CanyonPend Oreille90459,836
Cushman 2Mason85160,490
Swift 2Cowlitz72n/a
Long LakeLincoln70435,363
Cowlitz FallsLewis70195,646
LaGrandePierce64291,231
ChelanChelan59325,166

Source: EIA Forms EIA-860 and EIA-923, 2025.