Solar power plant, North Carolina
Maiden Creek Solar Power Plant, North Carolina
Maiden Creek Solar Power Plant is a 69.3 MW solar power plant in Catawba County, North Carolina, operated by Duke Energy Carolinas, LLC, and it generated 116,918 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in North Carolina, and its capacity factor sits at the 21st percentile of U.S. solar plants. By 2025 generation it ranks 3,233rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does Maiden Creek Solar Power Plant run compared with other solar plants?
Maiden Creek Solar Power Plant had a capacity factor of 19% in 2025 on 69.3 MW of net summer capacity, the 21st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 70 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Maiden Creek Solar Power Plant | 19% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is Maiden Creek Solar Power Plant generating more or less than last year?
Generation at Maiden Creek Solar Power Plant fell 9.2% from 2024 to 2025, from 128,796 MWh to 116,918 MWh. Through August 2026 it is running 4.6% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 128,796 |
| 2025 | 116,918 |
| 2026 through August | 79,692 |
| 2025, same months | 76,188 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 13,220 |
| July 2026 | 13,190 |
| June 2026 | 9,953 |
| May 2026 | 11,027 |
| April 2026 | 10,661 |
| March 2026 | 10,638 |
| February 2026 | 3,862 |
| January 2026 | 7,141 |
| December 2025 | 7,649 |
| November 2025 | 10,647 |
| October 2025 | 10,383 |
| September 2025 | 12,051 |
| August 2025 | 10,823 |
| July 2025 | 9,956 |
| June 2025 | 14,579 |
| May 2025 | 9,606 |
| April 2025 | 10,696 |
| March 2025 | 10,009 |
| February 2025 | 789 |
| January 2025 | 9,730 |
| December 2024 | 8,187 |
| November 2024 | 8,249 |
| October 2024 | 12,043 |
| September 2024 | 9,820 |
| August 2024 | 13,940 |
| July 2024 | 12,966 |
| June 2024 | 13,068 |
| May 2024 | 12,934 |
| April 2024 | 9,938 |
| March 2024 | 11,982 |
| February 2024 | 7,741 |
| January 2024 | 7,928 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at Maiden Creek Solar Power Plant, and when do they retire?
1 operable generator totals 69.3 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 69 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PV1 | Operating | Solar Photovoltaic | 69 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns Maiden Creek Solar Power Plant?
EIA lists no joint owners for Maiden Creek Solar Power Plant. Duke Energy Carolinas, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Duke Energy Carolinas, LLC charge homes?
Duke Energy Carolinas, LLC, the operator of Maiden Creek Solar Power Plant, had an average residential price of 13.41¢ per kWh and an average bill of $134 a month in 2025, 4% below the North Carolina average of 14.00¢.
| Measure | Price | Monthly bill | Against North Carolina |
|---|---|---|---|
| Duke Energy Carolinas, LLC | 13.41¢ | $134 | 4% lower |
| North Carolina average | 14.00¢ | $146 | |
| U.S. average | 17.23¢ | $151 | 23% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is Maiden Creek Solar Power Plant?
Maiden Creek Solar Power Plant is in Maiden, Catawba County, North Carolina, at 35.5930° N, 81.1670° W. It sits in the Duke Energy Carolinas balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in North Carolina are similar in size?
North Carolina has 757 operable solar plants with 7,025 MW of capacity, and Maiden Creek Solar Power Plant's 69.3 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Cabin Creek Solar, LLC | Montgomery | 70 | 162,795 |
| Crooked Run | Pender | 70 | 137,181 |
| Bay Tree | Bladen | 70 | 146,548 |
| Maiden Creek Solar Power Plant | Catawba | 69 | 116,918 |
| Warsaw Farm | Duplin | 65 | 105,448 |
| Shoe Creek Solar, LLC | Scotland | 65 | 129,783 |
| Hawtree Solar | Warren | 65 | 125,944 |
Source: EIA Forms EIA-860 and EIA-923, 2025.