Battery and pumped storage power plant, Florida
Manatee Solar Energy Center, Florida
Manatee Solar Energy Center is a 484 MW power plant, 409 MW of it battery and pumped storage, in Manatee County, Florida, operated by Florida Power & Light Co, and it generated 104,284 MWh in 2025 (Forms EIA-860 and EIA-923). By 2025 generation it ranks 3,347th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
Is the Manatee Solar Energy Center plant generating more or less than last year?
Generation at Manatee Solar Energy Center rose 14.7% from 2024 to 2025, from 90,907 MWh to 104,284 MWh. Through August 2026 it is running 23.7% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 90,907 |
| 2025 | 104,284 |
| 2026 through August | 87,170 |
| 2025, same months | 70,473 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 13,302 |
| July 2026 | 13,614 |
| June 2026 | 9,891 |
| May 2026 | 11,875 |
| April 2026 | 12,048 |
| March 2026 | 9,126 |
| February 2026 | 8,150 |
| January 2026 | 9,164 |
| December 2025 | 9,651 |
| November 2025 | 9,613 |
| October 2025 | 11,981 |
| September 2025 | 2,566 |
| August 2025 | 1,637 |
| July 2025 | 2,871 |
| June 2025 | 4,360 |
| May 2025 | 13,444 |
| April 2025 | 14,811 |
| March 2025 | 14,608 |
| February 2025 | 9,881 |
| January 2025 | 8,861 |
| December 2024 | 8,878 |
| November 2024 | 8,333 |
| October 2024 | 8,842 |
| September 2024 | 10,625 |
| August 2024 | 4,329 |
| July 2024 | 2,418 |
| June 2024 | 10,484 |
| May 2024 | 3,801 |
| April 2024 | 11,052 |
| March 2024 | 10,176 |
| February 2024 | 7,693 |
| January 2024 | 4,276 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Manatee Solar Energy Center plant, and when do they retire?
2 operable generators total 484 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 75 | 15% | none reported |
| 2020s | 1 | 409 | 85% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Solar Photovoltaic | 75 | 2016 | n/a |
| BMS | Operating | Batteries | 409 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Manatee Solar Energy Center plant?
EIA lists no joint owners for Manatee Solar Energy Center. Florida Power & Light Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Florida Power & Light Co charge homes?
Florida Power & Light Co, the operator of Manatee Solar Energy Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.
| Measure | Price | Monthly bill | Against Florida |
|---|---|---|---|
| Florida Power & Light Co | 14.62¢ | $162 | 4% lower |
| Florida average | 15.21¢ | $168 | |
| U.S. average | 17.23¢ | $151 | 13% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
What fuels does the Manatee Solar Energy Center plant use?
Manatee Solar Energy Center has capacity on 2 fuels: 85% battery and pumped storage and 15% solar. In 2025, battery and pumped storage made -12% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Battery and pumped storage | 409 | 84.6% | -12,699 |
| Solar | 75 | 15.4% | 116,983 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Manatee Solar Energy Center plant?
Manatee Solar Energy Center is in Parrish, Manatee County, Florida, at 27.6075° N, 82.3553° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.