Natural gas power plant, California
Marathon Bay Area Cogen natural gas power plant, California
Marathon Bay Area Cogen is a 114 MW natural gas power plant in Contra Costa County, California, operated by Tesoro Marketing & Refining Co. LLC (Martinez), and it generated 585,121 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 81st percentile of U.S. natural gas plants. By 2025 generation it ranks 1,154th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Marathon Bay Area Cogen plant run compared with other natural gas plants?
The Marathon Bay Area Cogen plant had a capacity factor of 65% in 2025 on 104 MW of net summer capacity, the 81st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 236 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Marathon Bay Area Cogen | 65% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Marathon Bay Area Cogen plant generating more or less than last year?
Generation at Marathon Bay Area Cogen fell 15.2% from 2024 to 2025, from 689,814 MWh to 585,121 MWh. Through August 2026 it is running 3.4% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 689,814 |
| 2025 | 585,121 |
| 2026 through August | 402,074 |
| 2025, same months | 388,905 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 56,201 |
| July 2026 | 56,907 |
| June 2026 | 53,344 |
| May 2026 | 55,249 |
| April 2026 | 53,023 |
| March 2026 | 52,691 |
| February 2026 | 40,653 |
| January 2026 | 34,006 |
| December 2025 | 56,342 |
| November 2025 | 41,534 |
| October 2025 | 53,180 |
| September 2025 | 45,160 |
| August 2025 | 55,447 |
| July 2025 | 55,255 |
| June 2025 | 53,013 |
| May 2025 | 55,211 |
| April 2025 | 54,319 |
| February 2025 | 48,170 |
| January 2025 | 67,490 |
| December 2024 | 62,011 |
| November 2024 | 54,445 |
| October 2024 | 62,926 |
| September 2024 | 61,265 |
| August 2024 | 58,853 |
| July 2024 | 59,866 |
| June 2024 | 59,179 |
| May 2024 | 53,420 |
| April 2024 | 52,792 |
| March 2024 | 58,999 |
| February 2024 | 48,507 |
| January 2024 | 57,551 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Marathon Bay Area Cogen plant, and when do they retire?
3 operable generators total 114 MW, with an average age of 38 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1980s | 3 | 114 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| TG1 | Operating | Natural Gas Fired Combined Cycle | 40 | 1987 | n/a |
| TG2 | Operating | Natural Gas Fired Combined Cycle | 40 | 1987 | n/a |
| TG3 | Operating | Natural Gas Fired Combined Cycle | 34 | 1987 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Marathon Bay Area Cogen plant?
Tesoro Refining and Marketing Co LLC is the only joint owner reported for Marathon Bay Area Cogen, with 100.0%. Tesoro Marketing & Refining Co. LLC (Martinez) operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Marathon Bay Area Cogen plant?
Marathon Bay Area Cogen is in Martinez, Contra Costa County, California, at 38.0244° N, 122.0589° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in California are similar in size?
California has 304 operable natural gas plants with 40,211 MW of capacity, and Marathon Bay Area Cogen's 114 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Malaga Power LLC | Fresno | 121 | 7,634 |
| Niland Gas Turbine Plant | Imperial | 121 | 35,025 |
| Orange Grove Peaking Facility | San Diego | 118 | 9,079 |
| Marathon Bay Area Cogen | Contra Costa | 114 | 585,121 |
| Olive | Los Angeles | 110 | 0 |
| Harbor Cogen | Los Angeles | 107 | 8,645 |
| Miramar Energy Facility | San Diego | 106 | 7,041 |
Source: EIA Forms EIA-860 and EIA-923, 2025.