Marlboro Mill is a 51.4 MW biomass power plant in Marlboro County, South Carolina, operated by Domtar Paper Company Bennettsville, and it generated 213,488 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in South Carolina, and its capacity factor sits at the 82nd percentile of U.S. biomass plants. By 2025 generation it ranks 2,400th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

51.4 MWNameplate capacity
71%Capacity factor, 2025, 82nd percentile, on 34.2 MW net summer
0.2%Of SC generation, 2025
15 yearsAverage generator age, by MW

How hard does the Marlboro Mill plant run compared with other biomass plants?

The Marlboro Mill plant had a capacity factor of 71% in 2025 on 34.2 MW of net summer capacity, the 82nd percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 260 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Marlboro Mill71%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Marlboro Mill plant generating more or less than last year?

Generation at Marlboro Mill rose 7.6% from 2024 to 2025, from 198,465 MWh to 213,488 MWh.

Net generation by period
PeriodMWh
2024198,465
2025213,488
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202517,477
November 202521,463
October 202519,041
September 202512,671
August 202516,849
July 202517,533
June 202511,365
May 202518,779
April 202519,765
March 202518,147
February 202520,076
January 202520,323
December 202415,386
November 202420,645
October 20243,248
September 202413,078
August 202419,454
July 202418,198
June 20247,026
May 202420,881
April 202421,862
March 202416,687
February 202421,631
January 202420,371

Source: EIA Form EIA-923, through August 2026.

How much of South Carolina's electricity comes from the Marlboro Mill plant?

Marlboro Mill made 0.2% of the 103,930,530 MWh reported by South Carolina plants in 2025, from 0.2% of the state's 27,220 MW of capacity. By capacity it is the 56th largest of 215 plants in South Carolina, the 3,713th largest of 14,327 in the U.S. and the 84th largest of 585 biomass plants. By 2025 generation it is the 23rd largest of 197 generating plants in the state.

Marlboro Mill within South Carolina, 2025
MeasureThis plantSouth CarolinaShare
Capacity (MW)5127,2200.2%
Generation (MWh)213,488103,930,5300.2%
Biomass capacity (MW)5149110.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Marlboro Mill plant, and when do they retire?

1 operable generator totals 51.4 MW, with an average age of 15 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s151100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MG1OperatingWood/Wood Waste Biomass512010n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Marlboro Mill plant?

EIA lists no joint owners for Marlboro Mill. Domtar Paper Company Bennettsville operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Marlboro Mill plant?

Marlboro Mill is in Bennettsville, Marlboro County, South Carolina, at 34.6050° N, 79.7850° W. It sits in the South Carolina Public Service Authority balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in South Carolina are similar in size?

South Carolina has 16 operable biomass plants with 491 MW of capacity, and Marlboro Mill's 51.4 MW is 10% of that.

Biomass plants in South Carolina around this size
PlantCountyMW2025 MWh
International Paper Georgetown MillGeorgetown960
Florence MillFlorence92359,375
Marlboro MillMarlboro51213,483
Sonoco Products CoDarlington3857,901

Source: EIA Forms EIA-860 and EIA-923, 2025.