Wind power plant, Michigan

Meridian Wind Park power plant, Michigan

Meridian Wind Park is a 225 MW wind power plant in Gratiot County, Michigan, operated by DTE Electric Company, and it generated 498,214 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Michigan, and its capacity factor sits at the 23rd percentile of U.S. wind plants. By 2025 generation it ranks 1,344th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

225 MWNameplate capacity
25%Capacity factor, 2025, 23rd percentile, on 225 MW net summer
0.4%Of MI generation, 2025
2 yearsAverage generator age, by MW

How hard does the Meridian Wind Park plant run compared with other wind plants?

The Meridian Wind Park plant had a capacity factor of 25% in 2025 on 225 MW of net summer capacity, the 23rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 92 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Meridian Wind Park25%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Meridian Wind Park plant generating more or less than last year?

Generation at Meridian Wind Park rose 2.9% from 2024 to 2025, from 484,102 MWh to 498,214 MWh. Through August 2026 it is running 6.9% behind the same months of 2025.

Net generation by period
PeriodMWh
2024484,102
2025498,214
2026 through August312,713
2025, same months335,969
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202614,369
July 202625,625
June 202631,984
May 202644,854
April 202649,146
March 202650,415
February 202638,507
January 202657,813
December 202557,938
November 202551,361
October 202535,815
September 202517,131
August 202521,029
July 202519,879
June 202534,671
May 202544,737
April 202549,960
March 202562,701
February 202542,183
January 202560,809
December 202450,576
November 202449,441
October 202448,365
September 202426,179
August 202419,167
July 202416,981
June 202439,806
May 202435,187
April 202454,984
March 202454,083
February 202442,539
January 202446,794

Source: EIA Form EIA-923, through August 2026.

How much of Michigan's electricity comes from the Meridian Wind Park plant?

Meridian Wind Park made 0.4% of the 127,929,498 MWh reported by Michigan plants in 2025, from 0.6% of the state's 34,725 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 24th largest of 283 plants in Michigan, the 1,383rd largest of 14,327 in the U.S. and the 187th largest of 1,358 wind plants. By 2025 generation it is the 23rd largest of 261 generating plants in the state.

Meridian Wind Park within Michigan, 2025
MeasureThis plantMichiganShare
Capacity (MW)22534,7250.6%
Generation (MWh)498,214127,929,4980.4%
Wind capacity (MW)2253,7776.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Meridian Wind Park plant, and when do they retire?

1 operable generator totals 225 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1225100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine2252023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Meridian Wind Park plant?

EIA lists no joint owners for Meridian Wind Park. DTE Electric Company operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does DTE Electric Company charge homes?

DTE Electric Company, the operator of Meridian Wind Park, had an average residential price of 20.25¢ per kWh and an average bill of $126 a month in 2025, 1% above the Michigan average of 20.03¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Michigan
DTE Electric Company20.25¢$1261% higher
Michigan average20.03¢$127
U.S. average17.23¢$15114% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Meridian Wind Park plant?

Meridian Wind Park is in Merrill, Gratiot County, Michigan, at 43.4620° N, 84.3398° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Michigan are similar in size?

Michigan has 34 operable wind plants with 3,777 MW of capacity, and Meridian Wind Park's 225 MW is 6% of that.

Wind plants in Michigan around this size
PlantCountyMW2025 MWh
Isabella Wind ParkIsabella384854,298
Cross Winds Energy ParkTuscola231728,224
Meridian Wind ParkGratiot225498,214
Heartland FarmsGratiot200469,867
Pegasus WindTuscola178386,770
Polaris Wind ParkGratiot169454,620

Source: EIA Forms EIA-860 and EIA-923, 2025.