Natural gas power plant, Utah

Millcreek Power Generation natural gas power plant, Utah

Millcreek Power Generation is a 80 MW natural gas power plant in Washington County, Utah, operated by City of St George-(UT), and it generated 145,038 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Utah, and its capacity factor sits at the 51st percentile of U.S. natural gas plants. By 2025 generation it ranks 2,948th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

80 MWNameplate capacity
22%Capacity factor, 2025, 51st percentile, on 73.6 MW net summer
0.4%Of UT generation, 2025
17 yearsAverage generator age, by MW

How hard does the Millcreek Power Generation plant run compared with other natural gas plants?

The Millcreek Power Generation plant had a capacity factor of 22% in 2025 on 73.6 MW of net summer capacity, the 51st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 82 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Millcreek Power Generation22%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Millcreek Power Generation plant generating more or less than last year?

Millcreek Power Generation generated 145,038 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 8 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024148,882
2025145,038
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20250
November 20252,953
October 20256,842
September 202526,171
August 202534,852
July 202535,551
June 202526,846
May 202510,604
April 20251,219
March 20250
February 20250
January 20250
December 20240
November 20241
October 20249,554
September 202421,682
August 202433,871
July 202439,682
June 202431,542
May 20248,912
April 20243,638
March 20240
February 20240
January 20240

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from the Millcreek Power Generation plant?

Millcreek Power Generation made 0.4% of the 38,124,679 MWh reported by Utah plants in 2025, from 0.7% of the state's 11,140 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 21st largest of 126 plants in Utah, the 2,965th largest of 14,327 in the U.S. and the 968th largest of 1,962 natural gas plants. By 2025 generation it is the 42nd largest of 117 generating plants in the state.

Millcreek Power Generation within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)8011,1400.7%
Generation (MWh)145,03838,124,6790.4%
Natural gas capacity (MW)804,0232.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Millcreek Power Generation plant, and when do they retire?

2 operable generators total 80 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s14050%none reported
2010s14050%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MC1OperatingNatural Gas Fired Combustion Turbine402006n/a
MC2OperatingNatural Gas Fired Combustion Turbine402010n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Millcreek Power Generation plant?

EIA lists no joint owners for Millcreek Power Generation. City of St George-(UT) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of St George charge homes?

City of St George, the operator of Millcreek Power Generation, had an average residential price of 11.71¢ per kWh and an average bill of $109 a month in 2025, 10% below the Utah average of 13.02¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Utah
City of St George11.71¢$10910% lower
Utah average13.02¢$99
U.S. average17.23¢$15132% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Millcreek Power Generation plant?

Millcreek Power Generation is in St. George, Washington County, Utah, at 37.1121° N, 113.5166° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Utah are similar in size?

Utah has 22 operable natural gas plants with 4,023 MW of capacity, and Millcreek Power Generation's 80 MW is 2% of that.

Natural gas plants in Utah around this size
PlantCountyMW2025 MWh
Nebo Power StationUtah140768,547
Millcreek Power GenerationWashington80145,038
Murray TurbineSalt Lake42220

Source: EIA Forms EIA-860 and EIA-923, 2025.