Skip to main content
RateWatt

Nuclear power plant, Connecticut

Millstone nuclear power plant, Connecticut

Millstone is a 2,260 MW nuclear power plant in New London County, Connecticut, operated by Dominion Energy Nuclear Conn Inc, and it generated 16,708,717 MWh in 2025 (Forms EIA-860 and EIA-923). That is 38.2% of the generation reported in Connecticut, and its capacity factor sits at the 28th percentile of U.S. nuclear plants. By 2025 generation it ranks 23rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

2,260 MWNameplate capacity
90%Capacity factor, 2025, 28th percentile, on 2,108 MW net summer
38.2%Of CT generation, 2025
43 yearsAverage generator age, by MW

How hard does the Millstone plant run compared with other nuclear plants?

The Millstone plant had a capacity factor of 90% in 2025 on 2,108 MW of net summer capacity, the 28th percentile of the 54 U.S. nuclear plants with at least 20 MW. The typical nuclear plant reached 95%. That equals about 330 days at full output out of 365.

0%Shaded: the middle half of nuclear plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Millstone90%
Nuclear plants, 75th percentile97%
Nuclear plants, median95%
Nuclear plants, 25th percentile90%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Millstone plant generating more or less than last year?

Generation at Millstone fell 1.0% from 2024 to 2025, from 16,870,305 MWh to 16,708,717 MWh. Through August 2026 it is running 2.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202416,870,305
202516,708,717
2026 through August11,214,890
2025, same months10,924,471
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20261,487,532
July 20261,549,524
June 20261,258,763
May 20261,244,871
April 20261,114,673
March 20261,565,531
February 20261,420,114
January 20261,573,882
December 20251,572,926
November 20251,509,367
October 20251,213,930
September 20251,488,023
August 20251,397,998
July 20251,550,247
June 20251,512,989
May 20251,001,034
April 2025903,225
March 20251,568,612
February 20251,419,146
January 20251,571,220
December 20241,561,972
November 20241,321,169
October 2024972,997
September 20241,070,529
August 20241,514,012
July 20241,548,361
June 20241,508,201
May 20241,557,143
April 20241,517,438
March 20241,568,155
February 20241,466,547
January 20241,263,781

Source: EIA Form EIA-923, through August 2026.

How much of Connecticut's electricity comes from the Millstone plant?

Millstone made 38.2% of the 43,744,586 MWh reported by Connecticut plants in 2025, from 20.6% of the state's 10,990 MW of capacity. Its share of output is 1.9 times its share of capacity. By capacity it is the largest of 182 plants in Connecticut, the 54th largest of 14,327 in the U.S. and the 20th largest of 56 nuclear plants. By 2025 generation it is the largest of 168 generating plants in the state.

Millstone within Connecticut, 2025
MeasureThis plantConnecticutShare
Capacity (MW)2,26010,99020.6%
Generation (MWh)16,708,71743,744,58638.2%
Nuclear capacity (MW)2,2602,260100.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Millstone plant, and when do they retire?

2 operable generators total 2,260 MW, with an average age of 43 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s191040%none reported
1980s11,35060%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
2OperatingNuclear9101975n/a
3OperatingNuclear1,3501986n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Millstone plant?

3 owners report shares in Millstone; Dominion Energy Nuclear Conn Inc holds the largest named share, 55.8% or about 1,262 MW. Dominion Energy Nuclear Conn Inc operates the plant. The listed shares add up to 59.7% of capacity; generators without joint owners are not on this list.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Dominion Energy Nuclear Conn Inc55.8%1,2629,330,148
Massachusetts Mun Wholes Electric Co2.9%65479,540
Green Mountain Power Corp1.0%23172,100

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Millstone plant?

Millstone is in Waterford, New London County, Connecticut, at 41.3107° N, 72.1677° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.