Solar power plant, Maine
Milo PV-BD Solar 1 LLC power plant, Maine
Milo PV-BD Solar 1 LLC is a 20 MW solar power plant in Piscataquis County, Maine, operated by BD Solar 1 LLC, and it generated 24,539 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Maine, and its capacity factor sits at the 11th percentile of U.S. solar plants. By 2025 generation it ranks 4,983rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Milo PV-BD Solar 1 LLC plant run compared with other solar plants?
The Milo PV-BD Solar 1 LLC plant had a capacity factor of 14% in 2025 on 20 MW of net summer capacity, the 11th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 51 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Milo PV-BD Solar 1 LLC | 14% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Milo PV-BD Solar 1 LLC plant generating more or less than last year?
Generation at Milo PV-BD Solar 1 LLC fell 20.4% from 2024 to 2025, from 30,833 MWh to 24,539 MWh.
| Period | MWh |
|---|---|
| 2024 | 30,833 |
| 2025 | 24,539 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 415 |
| November 2025 | 1,492 |
| October 2025 | 2,660 |
| September 2025 | 3,542 |
| August 2025 | 4,451 |
| July 2025 | 3,877 |
| June 2025 | 2,983 |
| May 2025 | 2,532 |
| April 2025 | 1,290 |
| March 2025 | 866 |
| February 2025 | 236 |
| January 2025 | 195 |
| December 2024 | 474 |
| November 2024 | 647 |
| October 2024 | 2,646 |
| September 2024 | 3,422 |
| August 2024 | 3,526 |
| July 2024 | 3,786 |
| June 2024 | 3,505 |
| May 2024 | 3,628 |
| April 2024 | 3,582 |
| March 2024 | 2,311 |
| February 2024 | 2,386 |
| January 2024 | 920 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Milo PV-BD Solar 1 LLC plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| MILPV | Operating | Solar Photovoltaic | 20 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Milo PV-BD Solar 1 LLC plant?
EIA lists no joint owners for Milo PV-BD Solar 1 LLC. BD Solar 1 LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Milo PV-BD Solar 1 LLC plant?
Milo PV-BD Solar 1 LLC is in Milo, Piscataquis County, Maine, at 45.2670° N, 68.9910° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Maine are similar in size?
Maine has 175 operable solar plants with 960 MW of capacity, and Milo PV-BD Solar 1 LLC's 20 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Milo PV - BD Solar 1 LLC | Piscataquis | 20 | 24,539 |
| Walden Solar Maine V | Androscoggin | 20 | 35,931 |
| Mousam River Solar | York | 20 | 6,884 |
Source: EIA Forms EIA-860 and EIA-923, 2025.